Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 67 Interior remodel to repalce shower with steam shower in lower level bathroom and divide large bedroom into two bedrooms with dividing wall and separate door and enlarge window for egress. Client: Family Menanno-Mack | Applicant: Nubilt Restoration & Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 30, 2008 | Current use: Single family d | |||||
SCORE 100 Installation of 8. 98 kw solar array, flush mounted and grid tied. Not to exceed roof height. Date: February 25, 2010 Contractor: Enlighten Electric Inc Client: Kevin Eber | Applicant: Enlighten Electric, Inc. | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 15, 2010 | Current use: Single family d | |||||
SCORE 100 Installation of 8. 98 kw solar array, flush mounted and grid tied. Not to exceed roof height. Client: Kevin Eber | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 15, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00704 | |||||
SCORE 67 Interior remodel to repalce shower with steam shower in lower level bathroom and divide large bedroom into two bedrooms with dividing wall and separate door and enlarge window for egress. Client: Family Menanno-Mack | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 30, 2008 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2008-01347 |