Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Renewable energy system - fuel cell total system size in kilowatts: 5 other relevant system specifications: ce-5 6 2 10... Plan change; see c of a... Vmt Date: April 8, 2010 Permit type: Combination : 8008 - | Permit status: Permit expired | Permit id: Pds2010-1031-20 | |||||
Renewable energy system - fuel cell total system size in kilowatts 5 other relevant system specifications ce-5 6/2/10... Plan change; see c of a... Vmt Date: April 8, 2010 Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2010-1031-20 | |||||
SCORE 93 93 sqft re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material tpo tile proposed roofing material tpo tile manufacturer carlisle eagle tile brand and model carlisle tpo malibu standard weight color (if cool roof required) tan abonde blend built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) low or steep sloped roof w no ducts in the attic required building inspector field verification (if applicable) none Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 59 Renewable energy system - fuel cell total system size in kilowatts 5 other relevant system specifications ce-5 11 01 17 permit renewed at 25% of current fee. Must call for inspection within 1 days to keep permit active. Tnh 6 2 10... Plan change; see c of a... Vmt Date: April 8, 2010 Contractor: Clearedge Power Corporation Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2010-1031-20 | |||||
Permit renewal Date: November 1, 2017 Permit status: Done | Permit id: Pds2010-1031-20 | |||||
Roof nail Date: January 2, 2018 Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Lath/drywall - interior Date: September 6, 2010 Permit status: Fail | Permit id: Pds2010-1031-20 | |||||
Final Date: July 24, 2009 Permit status: Pass | Permit id: Pds2009-1030-20 | |||||
Final Date: February 22, 2008 Permit status: Pass | Permit id: Pds2007-1005-20 | |||||
Shower(s)/hot mop/liner/lath Date: October 9, 2007 Permit status: Pass | Permit id: Pds2007-1005-20 |