Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Apt 4a) at bathroom : repair broken plastered surface at ceiling, approx. Sq. Ft. Paint entire bathroom ceiling. Remove all work related debris. Date: April 30, 2007 Permit type: Gc | Permit id: E728664 | |||||
Apt#1a, bath room abate the nuisance consisting of water leak at ceiling trace & repair . Repair ceiling with similar material approx 4 sq ft prime p Date: April 27, 2011 Permit type: Gc | Permit id: Eb28932 | |||||
Apt #2f) scope: trace and repair the source of loose plaster above the kitchen. Child under 6. At kitchen: north wall: sq. Ft. And ceiling 77 sq. Date: October 11, 2007 Permit type: Gc | Permit id: E808919 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: August 23, 2006 Permit type: Delead | Permit id: E705911 | |||||
SCORE 97 Equipment work Date: December 16, 2010 Contractor: Kofsky And Son Inc Permit status: Permit issued | Permit id: 22006982301 | |||||
Plumbing Date: December 16, 2010 Permit status: Permit issued | Permit id: 22006982301 | |||||
Equipment work Date: December 27, 2012 Permit status: Permit issued | Permit id: 22024588401 | |||||
Public hall; locate and repair the leak over the vestibule ceiling. Repair and paint the vestibule ceiling. Use safe work practices for public ar Date: August 3, 2009 Permit type: Gc | Permit id: Ea05372 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 21, 2009 Permit type: Delead | Permit id: Ea07386 | |||||
Repair window guards in apt. 1d as per h. P. D. Guidelines : room e1 : repair 2 window guards room e4 : repair 1 window guard bathroom : repair 1 w Date: June 10, 2015 Value: $12 Permit type: Gc | Permit id: Ef22017 | |||||
At apt # 5d: livingroom -------re-install (1) window guard install (2) window stop. Room # 1 --- Date: December 5, 2011 Value: $77 Permit type: Gc | Permit id: Ec14370 | |||||
Reinstall w/g at 11/2 story public hall stairs Date: November 8, 2008 Value: $62 Permit type: Gc | Permit id: E915061 | |||||
SCORE 100 Plumbing Date: December 27, 2012 Contractor: Dmt Plumbing And Heating Co Permit status: Permit issued | Permit id: 22024588401 | |||||
SCORE 98 Equipment work Date: December 27, 2012 Contractor: Boro Fuel Oil Co. Inc Permit status: Permit issued | Permit id: 22024588401 | |||||
SCORE 100 Date: December 16, 2010 Contractor: Richard Kofsky Client: Celeste Vasquez | Client Address: 542 Main St New Rochelle Ny 10461 | Client Phone: (914) 380-8224 | Client Company: 1767 Weeks Avenue Assoc. | Permit status: Initial | Permit id: 220069823 | |||||
SCORE 96 Date: December 27, 2012 Contractor: Keith Cappuccio Client: Morris Pillar | Client Address: 1767 Weeks Avenue Bronx Ny 10457 | Client Phone: (718) 972-2382 | Client Company: 1767 Month Llc- C/o Eran Gohari | Permit status: Initial | Permit id: 220245884 | |||||
SCORE 98 Date: December 27, 2012 Contractor: Dov Traum Client: Morris Pillar | Client Address: 1767 Weeks Avenue Bronx Ny 10457 | Client Phone: (718) 972-2382 | Client Company: 1767 Month Llc- C/o Eran Gohari | Permit status: Initial | Permit id: 220245884 | |||||
SCORE 100 Date: December 16, 2010 Contractor: Richard Kofsky Client: Celeste Vasquez | Client Address: 542 Main St New Rochelle Ny 10461 | Client Phone: (914) 380-8224 | Client Company: 1767 Weeks Avenue Assoc. | Permit status: Initial | Permit id: 220069823 | |||||
SCORE 100 Plumbing Date: December 16, 2010 Contractor: Kofsky And Son, Inc Permit status: Permit issued | Permit id: 22006982301 | |||||
SCORE 93 Equipment work Date: December 27, 2012 Contractor: Boro Fuel Oil Co., Inc Permit status: Permit issued | Permit id: 22024588401 | |||||
Reinstall w g at 11 2 story public hall stairs Date: November 8, 2008 Value: $62 Permit type: Gc | Permit id: E915061 | |||||
As per the requirement contract with hpd. Apartment # 4b: ==> supply and install total (2) new window guards complete as follows: living room (1 Date: February 21, 2014 Permit type: Gc | Permit id: Ee14994 | |||||
Apt #1e) at bathroom : perfom the restoration approx. Sq. Ft. At ceiling and walls includes remove mold and mildew at wall, ceramic, and ceiling. F Date: April 3, 2009 Permit type: Gc | Permit id: E932363 | |||||
Apt. #3f , demo, shtrock, plaster/tape approx. Sq. Ft. Of damaged bathroom cieling. After patch repair, paint entire bathroom cieling. Note: c Date: July 16, 2012 Permit type: Gc | Permit id: Ed02104 | |||||
Apt #3f) at kitchen and bathroom: trace and repair the source of leak. At kitchen: ceiling sq. Ft. Room size 12x7x9.; <<<>>> and at bathroom: s Date: November 14, 2007 Permit type: Gc | Permit id: E810701 | |||||
Apt. #3f , demo, shtrock, plaster tape approx. Sq. Ft. Of damaged bathroom cieling. After patch repair, paint entire bathroom cieling. Note: c Date: July 16, 2012 Permit type: Gc | Permit id: Ed02104 | |||||
Apt # 5a at roof (over room # north/ east (3) : trace and repair the water leak from roof. Flash with bituminous compound approx. Sq. Ft. Date: December 15, 2011 Permit type: Gc | Permit id: Ec15043 | |||||
(apt. #5a) install new safety glass, lower sash window in livingroom, right side. Remove all work related debris. Contractor must sign and return Date: October 12, 2007 Permit type: Gc | Permit id: E808898 | |||||
(apt. #5a) at foyer: trace, locate, and repair the source of mold and mildew. Demolish and repair ceiling 25 sq. Ft. With sheetrock, tape, compound Date: April 13, 2007 Permit type: Gc | Permit id: E726459 | |||||
Apt. #5a ,bleed all radiators thruout apt. And replace radiator air valves and restore heat to all rooms. Total four ( 4 ) rooms. All debris must b Date: December 29, 2011 Permit type: Plumb | Permit id: Ec16034 | |||||
Apt # 5a at roof (over room # north east (3) : trace and repair the water leak from roof. Flash with bituminous compound approx. Sq. Ft. Date: December 15, 2011 Permit type: Gc | Permit id: Ec15043 | |||||
@ apt. # 4g - bathroom - trace and repair the source and remove the nuisance consisting of mold at all walls and ceiling. Use 50- bleach/ water Date: January 12, 2012 Permit type: Gc | Permit id: Ec16855 | |||||
Apt. #4g , bathroom , provide / install new anti scalding device at bath tub. Perform all restoration . Remove all work related debris Date: November 15, 2011 Permit type: Plumb | Permit id: Ec12615 | |||||
Apt. #4g , room en-2, trace, locate and repair the source of water leak above window and replace with similar material the defective surfaces of Date: November 16, 2011 Permit type: Gc | Permit id: Ec11803 | |||||
Apt. #4g , bathroom , provide install new anti scalding device at bath tub. Perform all restoration . Remove all work related debris Date: November 15, 2011 Permit type: Plumb | Permit id: Ec12615 | |||||
@ apt. # 4g - bathroom - trace and repair the source and remove the nuisance consisting of mold at all walls and ceiling. Use 50- bleach water Date: January 12, 2012 Permit type: Gc | Permit id: Ec16855 |