Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Installation of one soil boring to collect in-situ soils data needed to obtain a building permit in advance of foundation stabilization measures related to the on-site residential structure. The geotechnical soil boring will be completed with 6. 25" od hollow stem auger (hsa) and is planned to extend approximately in depth. Date: November 21, 2014 Client: Jeannine Scott | Applicant: Christopher W. G-Es, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500021 | |||||
SCORE 59 Installation of one soil boring to collect in-situ soils data needed to obtain a building permit in advance of foundation stabilization measures related to the on-site residential structure. The geotechnical soil boring will be completed with 6. 25" od hollow stem auger (hsa) and is planned to extend approximately in depth. Date: November 21, 2014 Contractor: Christopher W. Ges Llc Client: Jeannine Scott | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500021 | |||||
SCORE 59 Installation of one soil boring to collect in-situ soils data needed to obtain a building permit in advance of foundation stabilization measures related to the on-site residential structure. The geotechnical soil boring will be completed with 6. 25" od hollow stem auger (hsa) and is planned to extend approximately in depth. Date: November 21, 2014 Contractor: Christopher W. Ges, Llc Client: Jeannine Scott | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500021 | |||||
SCORE 89 Stabilize settling foundation with push piers Date: August 12, 2015 Contractor: Francisco Arana Client: Jeannine Scott | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1506283 |