Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Windows and or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: May 6, 2015 Permit type: Building : 3309 - re | Permit status: Permit finaled | Completion date: May 8, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 29, 2014 Contractor: Peter S Rive Permit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv with 225a panel upgrade for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 3 18 15 - plan change - added panel upgrade - see c of a - kp Date: February 16, 2015 Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: June 10, 2015 | Permit id: Pds2015-Resalt- | |||||
Windows and/or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: May 6, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2015 | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv with 225a panel upgrade for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 3/18/15 - plan change - added panel upgrade - see c of a - kp Date: February 16, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 10, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 29, 2014 Contractor: Solarcity Corporation Permit type: Residential alteration-addn | Permit status: Issued about to expire | Permit id: Pds2014-Resalt- | |||||
SCORE 86 Windows and or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: May 6, 2015 Contractor: Huntamer Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 82 Roof mount residential solar pv with 225a panel upgrade for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 3 18 15 - plan change - added panel upgrade - see c of a - kp Date: February 16, 2015 Contractor: Brite Energy Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 10, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: June 8, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: November 4, 2005 Permit status: Pass | Permit id: Pds2005-1009-20 |