New 1/8 sf portable. Revision #1- structural details update. Date: August 1, 2013 Value: $80,000 Applicant: Robert Evans | Permit type: Commercial | Permit id: Bldg-2013-04135 | Parcel: 3626059014 | |||||
Install one 1/8 sf portable. Redmond high school portable #2. Revision #1-structural details update. Date: August 1, 2013 Value: $80,000 Applicant: Josh Peterson | Permit type: Commercial | Permit id: Bldg-2013-04136 | Parcel: 3626059014 | |||||
Expedited ti - interior ti at exist redmond high school. Scope includes minor demolition and construction to accommodate 3 new quiet rooms/ a staff office and expanded toilet room. Area of construction is 3 sq ft. Date: August 5, 2013 Value: $29,000 Applicant: Cliff Moon | Permit type: Commercial | Permit id: Bldg-2013-06754 | Parcel: 3626059014 | |||||
Comm ex alt - redmond high school - 1st floor science classrooms - renovation of existing science lab classroom and adjacent prep space on the first floor. Demo existing interior separating walls/ replaced with two science lab classrooms. Project consists of metal framed walls/ suspended acoustical ceiling tiles/ doors and frames/ casework/ light fixtures and mech/elec/plumb. Remove existing exterior door/ infill wall assembly. Area of work 1/9 sq. Ft. Date: June 8, 2015 Value: $196,500 Applicant: Dustin Schaefer | Permit type: Commercial | Permit id: Bldg-2015-01610 | Parcel: 3626059014 | |||||
Redmond high school - 1st floor science classrooms - renovate existing science classrooms. Adding 2 gas lines for tarrets. Date: June 12, 2015 Value: $700 Applicant: Phil Robson | Permit type: Mechanical - otc | Permit id: Mech-2015-04357 | Parcel: 3626059014 | |||||
Redmond high school - 1st floor science classrooms - customer paid for (2) floor drains and (18) utility/laundry tray (2) emergency shower/eyewash. Total 22 fixtures. Date: June 12, 2015 Value: $52,770 Applicant: Phil Robson | Permit type: Plumbing - otc | Permit id: Plum-2015-04356 | Parcel: 3626059014 | |||||
Sopa redmond high school science lab classroom 253-857-2056 fire sprinkler t. I. (23 sprinklers) Date: June 25, 2015 Applicant: Angie Voelpel | Permit type: Fire sprinkler - commercial | Permit id: Fire-2015-04758 | Parcel: 3626059014 | |||||
Redmond high school - 1st floor science classrooms - install (8) fire alarms/ (15) low voltage/ (15) new/altered circuits. Date: July 10, 2015 Value: $26,000 Applicant: Dan Michael | Permit type: Electrical plan review | Permit id: Elec-2015-04660 | Parcel: 3626059014 | |||||
Sopa - redmond high school - room 128 and 1 - 206-724-4642 - relocate two devices one in room 128 and the other in room 130. Plans on site. Date: August 24, 2015 Applicant: Brian Vanderheyden | Permit type: Fire alarm | Permit id: Fire-2015-06386 | Parcel: 3626059014 | |||||
Redmond high school - e-115 - chris @ advantage = 425-766-1699 - remodel of existing storage room into a science prep room/ adding (5) new circuits & altering (2) existing circuits. Changing light fixtures to led fixtures (7 each)/ installing (8) duplex receptacles. Customer paid for (7) new/altered circuits. Date: August 15, 2016 Value: $6,900 Applicant: Chris Johnson | Permit type: Electrical plan review | Permit id: Elec-2016-06723 | Parcel: 3626059014 | |||||
SCORE 95 New 1 8 sf portable. Revision #1- structural details update. Applicant: Robert Evans | Permit type: Commercial | Permit id: Bldg-2013-04135 | Parcel: 3626059014 | |||||
SCORE 80 Expedited ti - interior ti at exist redmond high school. Scope includes minor demolition and construction to accommodate 3 new quiet rooms a staff office and expanded toilet room. Area of construction is 3 sq ft. Applicant: Cliff Moon | Permit type: Commercial | Permit id: Bldg-2013-06754 | Parcel: 3626059014 | |||||
SCORE 95 Install one 1 8 sf portable. Redmond high school portable #2. Revision #1-structural details update. Applicant: Josh Peterson | Permit type: Commercial | Permit id: Bldg-2013-04136 | Parcel: 3626059014 | |||||
SCORE 59 Comm ex alt - redmond high school - 1st floor science classrooms - renovation of existing science lab classroom and adjacent prep space on the first floor. Demo existing interior separating walls replaced with two science lab classrooms. Project consists of metal framed walls suspended acoustical ceiling tiles doors and frames casework light fixtures and mech elec plumb. Remove existing exterior door infill wall assembly. Area of work 1 9 sq. Ft. Applicant: Dustin Schaefer | Permit type: Commercial | Permit id: Bldg-2015-01610 | Parcel: 3626059014 | |||||
SCORE 65 Redmond high school - 1st floor science classrooms - install (8) fire alarms (15) low voltage (15) new altered circuits. Applicant: Dan Michael | Permit type: Electrical plan review | Permit id: Elec-2015-04660 | Parcel: 3626059014 | |||||
SCORE 100 Redmond high school - e-115 - chris @ advantage = 425-766-1699 - remodel of existing storage room into a science prep room adding (5) new circuits & altering (2) existing circuits. Changing light fixtures to led fixtures (7 each) installing (8) duplex receptacles. Customer paid for (7) new altered circuits. Applicant: Chris Johnson | Permit type: Electrical plan review | Permit id: Elec-2016-06723 | Parcel: 3626059014 | |||||
SCORE 100 Sopa redmond high school science lab classroom 253-857-2056 fire sprinkler t. I. (23 sprinklers) Date: June 25, 2015 Contractor: Emerald Fire Llc Applicant: Angie Voelpel | Permit type: Fire sprinkler - commercial | Permit id: Fire-2015-04758 | Parcel: 3626059014 | |||||
SCORE 93 Sopa - redmond high school - room 128 and 1 - 206-724-4642 - relocate two devices one in room 128 and the other in room 130. Plans on site. Date: August 24, 2015 Contractor: Red Hawk Fire And Security Llc Applicant: Brian Vanderheyden | Permit type: Fire alarm | Permit id: Fire-2015-06386 | Parcel: 3626059014 | |||||
SCORE 72 Redmond high school - 1st floor science classrooms - renovate existing science classrooms. Adding 2 gas lines for tarrets. Applicant: Phil Robson | Permit type: Mechanical - otc | Permit id: Mech-2015-04357 | Parcel: 3626059014 | |||||
SCORE 72 Redmond high school - 1st floor science classrooms - customer paid for (2) floor drains and (18) utility laundry tray (2) emergency shower eyewash. Total 22 fixtures. Applicant: Phil Robson | Permit type: Plumbing - otc | Permit id: Plum-2015-04356 | Parcel: 3626059014 | |||||
SCORE 95 New 1 8 sf portable. Revision #1- structural details update. Applicant: Robert Evans | Permit type: Commercial | Permit id: Bldg-2013-04135 | |||||
SCORE 80 Expedited ti - interior ti at exist redmond high school. Scope includes minor demolition and construction to accommodate 3 new quiet rooms a staff office and expanded toilet room. Area of construction is 3 sq ft. Applicant: Cliff Moon | Permit type: Commercial | Permit id: Bldg-2013-06754 | |||||
SCORE 95 Install one 1 8 sf portable. Redmond high school portable #2. Revision #1-structural details update. Applicant: Josh Peterson | Permit type: Commercial | Permit id: Bldg-2013-04136 | |||||
SCORE 72 Redmond high school - 1st floor science classrooms - renovate existing science classrooms. Adding 2 gas lines for tarrets. Applicant: Phil Robson | Permit type: Mechanical - otc | Permit id: Mech-2015-04357 | |||||
SCORE 100 Sopa redmond high school science lab classroom 253-857-2056 fire sprinkler t. I. (23 sprinklers) Date: June 25, 2015 Contractor: Emerald Fire Llc Applicant: Angie Voelpel | Permit type: Fire sprinkler - commercial | Permit id: Fire-2015-04758 | |||||
SCORE 59 Comm ex alt - redmond high school - 1st floor science classrooms - renovation of existing science lab classroom and adjacent prep space on the first floor. Demo existing interior separating walls replaced with two science lab classrooms. Project consists of metal framed walls suspended acoustical ceiling tiles doors and frames casework light fixtures and mech elec plumb. Remove existing exterior door infill wall assembly. Area of work 1 9 sq. Ft. Applicant: Dustin Schaefer | Permit type: Commercial | Permit id: Bldg-2015-01610 | |||||
SCORE 72 Redmond high school - 1st floor science classrooms - customer paid for (2) floor drains and (18) utility laundry tray (2) emergency shower eyewash. Total 22 fixtures. Applicant: Phil Robson | Permit type: Plumbing - otc | Permit id: Plum-2015-04356 | |||||
SCORE 65 Redmond high school - 1st floor science classrooms - install (8) fire alarms (15) low voltage (15) new altered circuits. Applicant: Dan Michael | Permit type: Electrical plan review | Permit id: Elec-2015-04660 | |||||
SCORE 100 Redmond high school - e-115 - chris @ advantage = 425-766-1699 - remodel of existing storage room into a science prep room adding (5) new circuits & altering (2) existing circuits. Changing light fixtures to led fixtures (7 each) installing (8) duplex receptacles. Customer paid for (7) new altered circuits. Applicant: Chris Johnson | Permit type: Electrical plan review | Permit id: Elec-2016-06723 | |||||
SCORE 93 Sopa #47595 - redmond high school - 206-623-31 - install (2) new emc units on existing brick monument customer paid for:(1) low voltage (1) illuminated signs Applicant: Kirsten Hanson | Permit type: Electrical - otc | Permit id: Elec-2017-02946 | |||||
SCORE 93 Sopa#47594 - redmond high school - 206-623-31 - install (2)new emc units on existing brick monument Applicant: Kirsten Hanson | Permit type: Sign | Permit id: Sign-2017-02943 | |||||
SCORE 99 Otc- lwsd redmond high school - install of (2) heat exchangers for the north and south loops; including (2) heat exchanger pumps (2) buffer tanks (4) air dirt separators (2) expansion tanks and associated appurtenances. The addition of the heat exchangers will isolate boiler loops from the ground source loops essentially a design modification to prevent re-occurring thermal shock to existing heat exchangers. Customer paid for (10) gas water heaters (2) heat pumps and (12) hydronic piping Applicant: Jim Thomas | Permit type: Mechanical - otc | Permit id: Mech-2017-08306 | |||||
SCORE 93 Sopa #47595 - redmond high school - 206-623-31 - install (2) new emc units on existing brick monument customer paid for:(1) low voltage (1) illuminated signs Applicant: Kirsten Hanson | Permit type: Electrical - otc | Permit id: Elec-2017-02946 | Parcel: 3626059014 | |||||
SCORE 99 Otc- lwsd redmond high school - install of (2) heat exchangers for the north and south loops; including (2) heat exchanger pumps (2) buffer tanks (4) air dirt separators (2) expansion tanks and associated appurtenances. The addition of the heat exchangers will isolate boiler loops from the ground source loops essentially a design modification to prevent re-occurring thermal shock to existing heat exchangers. Customer paid for (10) gas water heaters (2) heat pumps and (12) hydronic piping Applicant: Jim Thomas | Permit type: Mechanical - otc | Permit id: Mech-2017-08306 | Parcel: 3626059014 | |||||
SCORE 93 Sopa#47594 - redmond high school - 206-623-31 - install (2)new emc units on existing brick monument Applicant: Kirsten Hanson | Permit type: Sign | Permit id: Sign-2017-02943 | Parcel: 3626059014 |