Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit Date: July 2, 2015 Permit status: Active | Permit id: 582278 | |||||
Mechanical permit Date: September 14, 2016 Permit status: Active | Permit id: 721950 | |||||
Electrical permit Date: July 25, 2016 Permit status: Active | Permit id: 700461 | |||||
Plumbing permit Date: June 16, 2016 Permit status: Active | Permit id: 671003 | |||||
Zoning/use permit Date: January 4, 2012 Permit status: Completed | Permit id: 377245 | |||||
Zoning/use permit Date: November 7, 2014 Permit status: Completed | Permit id: 570984 | |||||
Suppression permit Date: July 22, 2016 Permit status: Active | Permit id: 702844 | |||||
Plumbing permit Date: June 16, 2016 Permit status: Active | Permit id: 671003 | |||||
Electrical permit Date: September 22, 2016 Permit status: Active | Permit id: 711716 | |||||
Suppression permit Date: July 22, 2016 Permit status: Active | Permit id: 702844 | |||||
Zoning use permit Date: January 4, 2012 Permit status: Completed | Permit id: 377245 | |||||
Mechanical permit Date: September 14, 2016 Permit status: Active | Permit id: 721950 | |||||
Zoning use permit Date: November 7, 2014 Permit status: Completed | Permit id: 570984 | |||||
New construction permit Date: July 2, 2015 Permit status: Active | Permit id: 582278 | |||||
SCORE 89 Install new 600amp complete service with new wiring to include outlets, lights,switches and smoke detectors as per 2008 nec (north district) Date: September 22, 2016 Contractor: Affinity Technologies Inc Client: Master Zw Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: March 29, 2017 | Permit id: 711716 | |||||
SCORE 82 Unit (1) new ductwork air handler 2 ton in basement heat pump 2 ton unit for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.(1) new ductwork air handler 2 ton in basement heat pump 2 tonez permit ductwork & warm-air appliances- Date: September 14, 2016 Contractor: Aleksandr Prozorov Client: Master Zw Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 721950 | |||||
Erection of a three story attached structure with cellar for usae as a duplex. Date: January 4, 2012 Client: Master Zw Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 4, 2012 | Permit id: 377245 | |||||
SCORE 100 Install 1 fire panel, 1 smoke detector, 23 horns, 1 horn strobe 2 pull station and tie in sprinkler as per nfpa 72 Date: July 25, 2016 Contractor: B H Holding Company Client: Master Zw Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 3, 2017 | Permit id: 700461 | |||||
SCORE 89 For installation of a new nfpa 13r fire sprinkler system with 2 inch fire service line as per plans. Date: July 22, 2016 Contractor: Aqueduct Fire Protection Client: Master Zw Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: April 3, 2017 | Permit id: 702844 | |||||
SCORE 93 New contruction: interior plumbing for a 4-story building with (5) dwelling units (multi-family). Separate permits are required for the backflow prevention containment assembly, the 6" combined sewer laterial, connected to the street main and the 1-1 2" domestic water service, connected to the street main. The installation will comply with the philadelphia plumbing code, 2004. Date: June 16, 2016 Contractor: Oleg Kapkanov Client: Master Zw Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 671003 | |||||
SCORE 100 Installing 1. 5 water service,main drian,curb trap and sewer lateral pa20162010011 (multi family)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: July 28, 2016 Contractor: Tommys Plumbing Client: Master Zw Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 16, 2017 | Permit id: 710942 | |||||
Proposed (4) story structure with cellar; 2nd, 3rd and 4th floor bays for use as (5) apts. Date: November 7, 2014 Client: Master Zw Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 7, 2014 | Permit id: 570984 | |||||
SCORE 98 For the erection of a new attached light-framed four (4) story structure for five (5) dwelling units to include type b unit, egress window well installations, and bay window installations. (separate permits required for electrical, mechanical, plumbing and fire suppression system installation.) Date: July 2, 2015 Contractor: Iac Contractors Inc Client: Master Zw Llc | Permit type: New construction permit | Permit status: Completed | Completion date: April 3, 2017 | Permit id: 582278 | |||||
SCORE 82 Unit 3 new ductwork package unit through wall 2 ton 2nd floor. Unit 4 new duct work 2 ton air handler 2 ton heat pump in back. Unit 5 new duct work air handler 2 ton heat pump in back Date: September 23, 2016 Contractor: Aleksandr Prozorov Client: Master Zw Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 724291 |