Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: April 22, 2016 Client: Lopsonzski 1715 Cecil B M | Permit status: Completed | Permit id: 683632 | |||||
Demolition permit Date: December 9, 2011 Client: Lopsonzski 1715 Cecil B M | Permit status: Completed | Permit id: 375876 | |||||
Zoning/use permit Date: December 9, 2011 Client: Lopsonzski 1715 Cecil B M | Permit status: Completed | Permit id: 375878 | |||||
New construction permit Date: August 16, 2016 Client: Lopsonzski 1715 Cecil B M | Permit status: Active | Permit id: 704142 | |||||
Permit for the erection of an attached structure; bay windows at 2nd thru 4th floors for a multi-family household living (four (4) family dwelling) from cellar thru 4th floors and business and professional office on first floor frontage. Size and location as shown in the application. Date: June 23, 2014 Client: Lopsonzski 1715 Cecil B M | Applicant: Zhen H. Jin, Esq | Permit type: Appeal | Permit status: Denied | Permit id: 23124 | |||||
Demolition permit Date: December 9, 2011 Client: Lopsonzski 1715 Cecil B M | Permit status: Completed | Permit id: 375876 | |||||
New construction permit Date: August 16, 2016 Client: Lopsonzski 1715 Cecil B M | Permit status: Active | Permit id: 704142 | |||||
Plumbing permit Date: January 24, 2017 Client: Lopsonzski 1715 Cecil B M | Permit status: Active | Permit id: 742100 | |||||
Suppression permit Date: January 10, 2017 Client: Lopsonzski 1715 Cecil B M | Permit status: Active | Permit id: 744136 | |||||
Zoning use permit Date: April 22, 2016 Client: Lopsonzski 1715 Cecil B M | Permit status: Completed | Permit id: 683632 | |||||
Zoning use permit Date: December 9, 2011 Client: Lopsonzski 1715 Cecil B M | Permit status: Completed | Permit id: 375878 | |||||
Permit for the erection of an attached structure; bay windows at 2nd thru 4th floors for a multi-family household living (four (4) family dwelling) from cellar thru 4th floors and business and professional office on first floor frontage. Size and location as shown in the application. Date: June 23, 2014 Client: Lopsonzski 1715 Cecil B M | Applicant: Zhen H. Jin, Esq | Permit type: Appeal | Permit status: Denied | Permit id: 23124 | |||||
SCORE 100 (3) 3 4" water service,curb trap and lateral pa20171140651 (mixed use)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: April 24, 2017 Contractor: Superior Build Maintenance Client: Lopsonzski 1715 Cecil B M | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 777675 | |||||
SCORE 89 Installation 4 heat pump system with a required duck work & a common exhaust duct with 2-hr fire resistance rated shaft enclosure in accordance Date: February 8, 2017 Contractor: Sanks Mechanical Client: Lopsonzski 1715 Cecil B M | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 7, 2017 | Permit id: 741210 | |||||
SCORE 73 Demo entire building free standing , remove debris, collapse basement clean fill to grade level. See attached asbestos report in scanned file. Date: December 9, 2011 Contractor: Cjb Construction Group Ltd Client: Lopsonzski 1715 Cecil B M | Permit type: Demolition permit | Permit status: Completed | Completion date: June 11, 2013 | Permit id: 375876 | |||||
SCORE 100 New electrical wiring throughout low voltage wiring reg cable cat5e, hardwired, interconneted 1 v smoke detectors. 4 amp service & 4 gang meter sockets and 4 sub panels as per 2008 nec fire alarm as per nfpa72 north district Date: March 20, 2017 Contractor: Abraham Buyag Client: Lopsonzski 1715 Cecil B M | Permit type: Electrical permit | Permit status: Completed | Completion date: August 7, 2017 | Permit id: 742176 | |||||
SCORE 73 For the erection of a four-story mixed-use structure to be used as a vacant commercial space and two (2) dwelling units. Building shall be fully sprinklered. Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. Date: August 16, 2016 Contractor: Lopsonzski 1809 N Willington Client: Lopsonzski 1715 Cecil B M | Permit type: New construction permit | Permit status: Completed | Completion date: August 7, 2017 | Permit id: 704142 | |||||
SCORE 73 Demo entire building free standing , remove debris, collapse basement clean fill to grade level Date: December 9, 2011 Contractor: Cjb Construction Group Ltd Client: Lopsonzski 1715 Cecil B M | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 9, 2011 | Permit id: 375878 | |||||
SCORE 93 For the installation of an automatic sprinkler system in accordance with nfpa 13 throughout a new, four (4) story, mixed-use structure, using a new 2" fire service line, and a new 2-1 2" backflow prevention device, as per plans. Date: January 10, 2017 Contractor: Harring Fire Protection Llc Client: Lopsonzski 1715 Cecil B M | Permit type: Suppression permit | Permit status: Completed | Completion date: August 7, 2017 | Permit id: 744136 | |||||
SCORE 100 New construction: interior plumbing of a 4-story building with vacant commercial space and (2) dwelling units. The installation will comply with the philadelphia plumbing code, 2004. Separate permits are required for the (2) 1-1 2" and (1) 3 4" domestic water distribution services and the 5" sewer lateral to the street mains, as well as the 3 4" backflow prevention containment assembly. Additional permits are required for the vacant commercial space (other than work shown on the approved plans which are part of this permit). Fuel gas piping and equipment is not part of this permit and requires a mechanical permit. Pvc pipe materials are not permitted, per code sections p-902. 5 & p-1102. 3. Date: January 24, 2017 Contractor: Superior Build Maintenance Client: Lopsonzski 1715 Cecil B M | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 742100 |