Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 13000-03114: layout changes for the open floor plan which then requires changes to architectural details, mep, and structural plans Date: December 16, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00759 | |||||
SCORE 96 13-3114: field clarification ceiling lighting baffle structural assembly details. Date: October 16, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00631 | |||||
SCORE 96 13-3114: theranos: change mechanical rooftop penthouse to be pre-manufactured. No change in height or dimensions Date: August 29, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00517 | |||||
SCORE 96 13000-03114: deferred submittal for glass guard Date: September 9, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00538 | |||||
SCORE 96 13000-03114: deferred submittal for anchorage of mazak, lathe, and acra mill Date: October 17, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00635 | |||||
SCORE 96 Theranos: ti and u&o for a 116,0 sf tenant space on both floors of the building. Scope of work includes new rooftop equipment. Scope of work includes new diesel generator and step down transformers located after the meter. Permit status: Permit issued | Permit id: 13000-03114 | |||||
SCORE 99 New 2-story warm shell r&d commercial building plus basement garage. First floor area of 65,048 sf, second floor area of 50,536 sf and basement garage of 82,768 sf. Proposed grease interceptor for future cafeteria and industrical waste system for future laboratories. Date: December 13, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12000-03029 | |||||
SCORE 99 Phase i site utilities improvements: relocation of gas line, gas meter and fire water service line Date: November 14, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12000-02821 | |||||
SCORE 96 13000-03114: deferred submittal for anchorage of ups and server racks Date: September 25, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00586 | |||||
SCORE 100 12000-03029: (3) new blue oaks, replace redwood, and landscape changes. Date: September 25, 2014 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 14rev-00582 | |||||
SCORE 100 12000-03029: 2 hour shaft from garage to roof for das system, (2) new water proof cabinets, add new subpanel. Date: September 25, 2014 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 14rev-00584 | |||||
SCORE 100 12000-03029: new cellular mode irrigation controller Date: September 25, 2014 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 14rev-00583 | |||||
SCORE 96 13000-03114: changes to finishes in southern portion of the building. Date: July 22, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00427 | |||||
SCORE 96 13000-03114: changes to layout and material based on tenant requests. Date: May 1, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00258 | |||||
SCORE 100 12000-03029: roof screen change Date: June 4, 2014 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 14rev-00339 | |||||
SCORE 96 13000-03114: change in landscape, pear tree counts, revise relocation of redwood, relocate redwood, and terminate (1) redwood. Date: June 3, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00336 | |||||
SCORE 96 Two construction trailers (13 sf) on private property. No sewer or water connection. Per sid: accessibility details to be a deferred submittal Permit status: Permit issued | Permit id: 14000-00409 | |||||
SCORE 96 (14000-00409) ramp details Date: February 24, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00109 | |||||
SCORE 99 (12000-03029) deferred submittal for fixed louvers Date: December 3, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00752 | |||||
SCORE 99 (12000-03029) anchorage detail for free standing wall Date: December 12, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00771 | |||||
SCORE 99 (12000-03029) miscellaneous minor revision to construction detailing as a result of contractor coordination and project submitals. Mischellaneous architectural coordination with previous comments on plubing and electrical from bulletin 6 & 7 scope also includes updates to the grading and drainage plan. Date: October 28, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00665 | |||||
SCORE 99 (12000-03029) deferred submittal for elevator guide rails Date: December 3, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00753 | |||||
SCORE 99 12-3029: deferred tpo roofing data specs and associated shop drawings. Date: October 30, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00672 | |||||
SCORE 99 12-3029: deferred submittal - exterior metal railings Date: October 24, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00655 | |||||
SCORE 99 12-3029: deferred submittal - exterior aluminum panels Date: October 24, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00654 | |||||
SCORE 99 (12000-03029) window system deferred Date: September 26, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00585 | |||||
SCORE 99 (12000-03029) deferred submittal: skylight framing & anchorage details Date: August 29, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00537 | |||||
SCORE 99 (12000-03029) horizonal fall restrain anchor and cable location update Date: August 13, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00506 | |||||
SCORE 99 (12000-03029)plumbing revision resulting from 13rev-00392 Date: July 30, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00485 | |||||
SCORE 99 (12000-03029) deferred submittal for exterior precast and interior stairs. Date: July 16, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00449 | |||||
SCORE 99 (ref permit #12-3029) revisions to the r&d warm shell building: revised restroom cores: added water closets and showers , exterior courtyard fence added, structural revisions, roof-top mechanical changes, site lighting changes Date: June 20, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00392 | |||||
SCORE 99 (ref permit #12-3029) revisions to civil drawings to update porter dr, bollards @ gas meter, increased fire line size. Plumbing: relocated sprinkler drains, added roof drains and riser locations revised. Date: May 2, 2013 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 13rev-00290 | |||||
SCORE 59 Temp power -free standing switch gear (4 amps) Date: February 14, 2013 Contractor: Best Electrical Co., Inc Permit status: Permit issued | Permit id: 13000-00446 | |||||
SCORE 99 Demolition of 65,0 sf commercial building. Baaqmd j#3x975 (recd 11 29 12) Date: November 14, 2012 Contractor: Devcon Construction Permit status: Permit issued | Permit id: 12000-02824 | |||||
SCORE 59 Demo 5 gallon underground diesel tank. (new equipment shall be separate permit) Date: February 1, 2012 Contractor: Balch Petroleum Cont Permit status: Permit issued | Permit id: 12000-00257 | |||||
SCORE 96 13000-03114: deferred submittal - plumbing equipment seismic anchorage (compressor, vaccuum pump, hwst, water heater), no exterior changes Date: April 24, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15rev-00241 | |||||
SCORE 96 13000-03114: deferred submittal - interior curtain wall Date: April 24, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15rev-00240 | |||||
SCORE 96 13-3114: deferred north light baffles and supplemental glazing at executive office. Date: May 7, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15rev-00270 |