Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Mobile crane work zone Date: September 21, 2012 Contractor: Wo Grubb Permit status: Expired | Expiration date: September 29, 2012 | Permit id: Pa10073871 | |||||
SCORE 96 Verizon fios to overlash to existing copper cable 509 of fiber optic cable in squares 3509 and 3532 in ne bounded by rhode island ave, u st, north capitol st, t st and 1st st as shown on job 1a2k6vy Date: August 12, 2017 Contractor: Verizon Fios Permit type: Over head work; string telecom wire/fiber | Permit status: Revise and resubmit | Expiration date: January 13, 2018 | Permit id: 0 | |||||
SCORE 96 Over head work; string telecom wire fiber Contractor: Verizon Fios Permit status: 10 | Expiration date: January 13, 2018 | Permit id: 0 | |||||
SCORE 96 Verizon fios to overlash to existing copper cable 509 of fiber optic cable in squares 3509 and 3532 in ne bounded by rhode island ave, u st, north capitol st, t st and 1st st as shown on job 1a2k6vy Contractor: Verizon Fios Permit status: Revise and resubmit | Expiration date: January 13, 2018 | Permit id: 0 |