Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Cell site modification upgrades for existing verizon wireless to include remove and replace 1 antenna per sector on 3 sectors, 3 rrus, 1 surge demarcation junction box inside existing equipment shelter 1 monopole antenna w o surge protection, and 2 additional 6x12 power fiber cables from existing equipment shelter to antennas Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: January 8, 2015 | Permit id: Pds2014-Comalt- | |||||
Unmanned tellecommunication facility 4 equipment cabinets inside cmu wall enclosure, 1 52 high chameleon eucalyptus, 6 nv panel antennas, 2 rrh per antenna, 12 rrh total, 2 microwave antenna dishes, 1gps antenna, power, telco & coax cable runs, for sprint ![]() ![]() Permit type: Other : 3311 - com - | Permit status: Permit finaled | Completion date: April 22, 2015 | Permit id: Pds2014-Comacc- | |||||
Addition to existing verizon cell site - adding 1 sq ft metal equipment shelter for new generator and automatic transfer switch mounted inside existing shelter. 9-15-2014 permit renewed at current fees. Must have a valid inspection within 1 calendar days to keep permit active. ![]() ![]() Permit type: Other : 3311 - com - | Permit status: Permit expired | Permit id: Pds2012-1017-20 | |||||
SCORE 100 Cell site modification/upgrades for existing verizon wireless to include remove and replace 1 antenna per sector on 3 sectors, 3 rrus, 1 surge demarcation junction box inside existing equipment shelter 1 monopole antenna w/o surge protection, and 2 additional 6x12 power/fiber cables from existing equipment shelter to antennas Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: January 8, 2015 | Permit id: Pds2014-Comalt- | |||||
SCORE 100 Cell site modification upgrades for existing verizon wireless to include remove and replace 1 antenna per sector on 3 sectors, 3 rrus, 1 surge demarcation junction box inside existing equipment shelter 1 monopole antenna w o surge protection, and 2 additional 6x12 power fiber cables from existing equipment shelter to antennas Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: January 8, 2015 | Permit id: Pds2014-Comalt- | |||||
SCORE 95 Unmanned tellecommunication facility 4 equipment cabinets inside cmu wall enclosure, 1 52 high chameleon eucalyptus, 6 nv panel antennas, 2 rrh per antenna, 12 rrh total, 2 microwave antenna dishes, 1gps antenna, power, telco & coax cable runs, for sprint Permit type: New commercial acc structure | Permit status: Completed | Completion date: April 22, 2015 | Permit id: Pds2014-Comacc- | |||||
SCORE 92 Addition to existing verizon cell site - adding 1 sq ft metal equipment shelter for new generator and automatic transfer switch mounted inside existing shelter. 10 28 2016 permit renewed at current fees. Must have a valid inspection within 1 calendar days to keep permit active.... T. T. 9-15-2014 permit renewed at current fees. Must have a valid inspection within 1 calendar days to keep permit active. Permit type: Commercial alteration-addn | Permit status: Issued | Permit id: Pds2012-1017-20 | |||||
SCORE 96 Cell site mod for t-mobile as follows swapping 3 air21 b4a b2p panel antennas (1 per sector) with 3 a1r21 ba4 b4a b12p (1 per sector)mounted with existing panel antennas on existing mount and 3 rrus11-b-12 radio units below proposed a1r21 antennas. Also adding 1 xmu within an existing rbs3106 cabinet to support l7 removing existing dul and replacing with a dus Permit type: Commercial alteration-addn | Permit status: Issued | Permit id: Pds2016-Comalt- | |||||
SCORE 99 Cell site mod for verizon, work includes installing (6) antennas, installing (3) rru 32 behind antennas, install (3) rru a2 to (e) (3) rru 12 behind antennas, relocate (e) microwave antenna, install (n) t-arms on (e) monopole, and remove (2) existing antennas. Permit type: Addn | Permit status: Completed | Completion date: October 17, 2017 | Permit id: Pds2017-Comalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2016-Comalt- | |||||
Permit renewal ![]() Permit status: Done | Permit id: Pds2012-1017-20 | |||||
Stormwater insp ![]() Permit status: Monitor | Permit id: Pds2012-1017-20 | |||||
Stormwater insp ![]() Permit status: Monitor | Permit id: Pds2012-1017-20 | |||||
Stormwater insp ![]() Permit status: Monitor | Permit id: Pds2012-1017-20 | |||||
Foundation/steel/holdowns/abs/1st ![]() Permit status: Pass | Permit id: Pds2012-1017-20 |