Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Suppression permit Date: March 26, 2014 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 525482 | |||||
Plumbing permit Date: December 17, 2013 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 511663 | |||||
Mechanical permit Date: March 26, 2014 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 525479 | |||||
Electrical permit Date: January 15, 2014 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 515529 | |||||
Alteration permit Date: December 16, 2013 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 511507 | |||||
Mechanical permit Date: March 26, 2014 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 525479 | |||||
Plumbing permit Date: December 17, 2013 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 511663 | |||||
Suppression permit Date: March 26, 2014 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 525482 | |||||
Alteration permit Date: December 16, 2013 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 511507 | |||||
Electrical permit Date: January 15, 2014 Client: Rodriguez Baldemiro G | Permit status: Completed | Permit id: 515529 | |||||
SCORE 100 Electrical alterations on the 1st and 2nd floors - rewire (10)outlets and (8)luminaires on the 1st floor - rewire a 220v a c line, replace 110v (4)smoke and or combination smoke co detectors on the 2nd floor - work will comply with the 2008 nec Date: January 15, 2014 Contractor: Moon Electric A And N Inc Client: Rodriguez Baldemiro G | Permit type: Electrical permit | Permit status: Completed | Completion date: April 9, 2014 | Permit id: 515529 | |||||
SCORE 100 Replace waste line to existing to fixture (mixed use) Date: December 17, 2013 Contractor: Norman Cole Sr, Client: Rodriguez Baldemiro G | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2015 | Permit id: 511663 | |||||
SCORE 99 Level 1 alteration to the first floor space: shall comply with the provisions of chapter 6 of the international existing building code. To include the removal and replacement or the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serve the same purpose. No structural changes. Must maintain all code required fire rating on wall and floor ceiling assemblies. Contact streets department for dumpster permit and footway closure permits. Date: December 16, 2013 Contractor: Penstone Building Corp Client: Rodriguez Baldemiro G | Permit type: Alteration permit | Permit status: Completed | Completion date: June 11, 2014 | Permit id: 511507 | |||||
SCORE 99 For the installation of one (1) type 1 commercial kitchen hood (ul 710) , supply exhaust ductwork, and make up air fan. All work shall be done in accordance with approved plans. Manufacturers installation instruction shall be available on the job site at the time of inspection see ap 525482 for fire suppression system permit. Date: March 26, 2014 Contractor: Reliable Fire Protection Inc Client: Rodriguez Baldemiro G | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 525479 | |||||
SCORE 99 Install new wet chemical fire supression system with eight (8) flow points in accordance with nfpa 17a, see application #525479 for kitchen hood approval. Date: March 26, 2014 Contractor: Reliable Fire Protection Inc Client: Rodriguez Baldemiro G | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 525482 |