Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 The existing mainline conduit is broken down and we must build new mainline conduit in order to install new cable for the service heavy-up. Replace existing mainline conduit and build 34 of new mainline conduit only as necessary at 11th street ramp at 295 south (anacostia freeway) as indicated on the attached prints. Hours permitted to work are between 9: am to 3:30pm monday thru friday. ![]() ![]() Client: Pepco | Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: July 11, 2010 | Permit id: Pa54357 | |||||
SCORE 95 Excavation; electric ml conduit (trench) ![]() ![]() Permit status: 8 | Expiration date: July 11, 2010 | Permit id: Pa54357 |