Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Reese new mh to lot 17 Date: February 4, 2009 Permit status: Closed | Permit id: 09-00134 | |||||
SCORE 99 Reese new mh to lot 17 Client: Reese New Mh To Lot 17 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-00134 | Parcel: 20937 | |||||
SCORE 100 Reese new mh to lot 17 Client: Reese New Mh To Lot 17 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-00134 | Parcel: 20937 | |||||
January 5, 2009 1:09:56 pm kneel. Reese- new mh to lot 17 location: pattion to n louisiana to right on emma, emma hills on left.; january 27, 2009 8:43:19 am cbeavers amendment rec. To take off the mechanical permit january 27, 2009 2:00:29 pm heatherr. Premise #redacted phone number3 called in by frank burton; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Buildin Permit type: Permits - historical | Permit status: Closed | Permit id: 09-00134 | Parcel: 20937 | |||||
Reese new mh to lot 17 Date: February 4, 2009 Value: $32,800 Permit type: Historical | Permit status: Closed | Permit id: 09-00134 | |||||
January 5, 2009 1:09:56 pm kneel. Reese- new mh to lot 17 location: pattion to n louisiana to right on emma, emma hills on left.; january 27, 2009 8:43:19 am cbeavers amendment rec. To take off the mechanical permit january 27, 2009 2:00:29 pm heatherr. Premise #redacted phone number3 called in by frank burton; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Buildin Date: February 4, 2009 Permit type: Permits - historical | Permit status: Closed | Permit id: 09-00134 | Parcel: 20937 |