Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Development entry sign ![]() ![]() Permit type: Sign | Permit status: Inspections | Permit id: Bld2015-10633 | |||||
SCORE 99 Install 3 boilers, 2 cooling towers, 5 air handlers, 2 chillers, and 18 pumps. ![]() ![]() Permit type: Mechanical | Permit status: Closed | Completion date: January 25, 2016 | Permit id: Bld2014-08552 | |||||
SCORE 95 Development entry sign ![]() ![]() Permit type: Sign | Permit status: Inspections | Permit id: Bld2015-10633 | |||||
SCORE 95 Install new facp and connect to existing network of fire alarm panels. Add devices as shown on drawings for the core and shell of the cafeteria. Provide outputs to the bas system, coordinate signals needed with bas contractor. ![]() ![]() Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2015-10059 | |||||
SCORE 95 Fire sprinkler system ![]() ![]() Permit type: Fire | Permit status: In for review | Permit id: Bld2015-10681 | |||||
SCORE 74 Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room, to support this clean room, in a portion of the existing fabrication plant. This clean room will allow varian to complete a step in their fabrication process, in-house, that they currently outsource, saving them both time and money. ![]() ![]() Permit status: Closed | Completion date: January 25, 2016 | Permit id: Bld2014-03063 | |||||
SCORE 74 Int demo of bearing and shear masonry wall in preparation for construction of bld2014-03063 r. M. K. B. ![]() ![]() Permit status: Closed | Completion date: January 25, 2016 | Permit id: Bld2014-04296 |