SCORE 99 Install 3 boilers, 2 cooling towers, 5 air handlers, 2 chillers, and 18 pumps. Date: January 25, 2016 Contractor: Kemp And Hilton Inc Permit type: Mechanical | Permit status: Closed | Completion date: January 25, 2016 | Permit id: Bld2014-08552 | |||||
SCORE 73 Construct a 58 sq. Ft. Clean room and an associated 36 sq, ft. Mechanical room, to support this clean room, in a portion of the existing fabrication plant. This clean room will allow varian to complete a step in their fabrication process, in-house, that they currently outsource, saving them both time and money. Date: January 25, 2016 Contractor: Daw Technologies Llc Permit status: Closed | Completion date: January 25, 2016 | Permit id: Bld2014-03063 | |||||
SCORE 95 Install new facp and connect to existing network of fire alarm panels. Add devices as shown on drawings for the core and shell of the cafeteria. Provide outputs to the bas system, coordinate signals needed with bas contractor. Date: December 15, 2015 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2015-10059 | |||||
SCORE 73 Int demo of bearing and shear masonry wall in preparation for construction of bld2014-03063 r. M. K. B. Date: January 25, 2016 Contractor: Daw Technologies Llc Permit status: Closed | Completion date: January 25, 2016 | Permit id: Bld2014-04296 | |||||
SCORE 95 Fire sprinkler system Date: December 15, 2015 Contractor: Firetrol Protection Systems Permit type: Fire | Permit status: In for review | Permit id: Bld2015-10681 |