Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hra- re-roof asphalt shingles with asphalt shingles (cbo # 5433 er) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Date: August 28, 2013 Value: $21,941 Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: October 1, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 - re-roof asphalt shingles with asphalt shingles (cbo # 5433 er) your project may need to comply with cool roof requirements based on the 2008 building energy efficiency standards. Products required to comply must be labeled by the cool roof rating council (crrc), listed in the crrcs rated product directory (www. Coolroofs. Org), and tested for solar reflectance and thermal emittance. Your building inspector will check for compliance at inspection. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 1, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 9, 2015 Contractor: Sunfusion Solar Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 30, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 13, 2017 Contractor: A S I Hastings Inc Permit type: Addn | Permit status: Completed | Completion date: October 27, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: December 28, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: September 27, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |