Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Upper section strip the two layers of old rubber roof, and install new rubber roof w/ 1 1/2 water proof insulation. Instal drip edges all around roof. Lower section strip rubber roof, and install new rubber roof with 1 1/2" water proof insulation. Install drip edges all around. Replace damaged wood and cover with white aluminum. Repair the right side gutter. Remove chimney and cover with plywood. Clean up and remove waste after job is completed. Permit type: Roof | Completion date: July 24, 2013 | Parcel: 10624 | |||||
SCORE 84 Upper section strip the two layers of old rubber roof, and install new rubber roof w 1 1 2 water proof insulation. Instal drip edges all around roof. Lower section strip rubber roof, and install new rubber roof with 1 1 2" water proof insulation. Install drip edges all around. Replace damaged wood and cover with white aluminum. Repair the right side gutter. Remove chimney and cover with plywood. Clean up and remove waste after job is completed. Permit type: Roof | Completion date: July 24, 2013 | Permit id: 0 | Parcel: 10624 |