SCORE 99 Set 1" meter pit at peoples clinic for landscaping Date: June 28, 2007 Contractor: Rembrandt Excavating Inc Client: Clinic Peoples | Applicant: Rembrandt Excavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Service for irrigation meter Date: July 24, 2007 Contractor: Pullenwire Inc Client: Clinic Peoples | Applicant: Pullen-Wire, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: October 5, 2007 | Current use: Multifamily dwe | |||||
SCORE 95 Installation of vacuum breaker for sprikler system. Date: August 24, 2007 Contractor: Sammons Plumbing And Heating Client: For Habitat | Applicant: Sammons Plumbing & Heating | Permit type: Plumbing | Permit status: Cmp | Completion date: January 15, 2008 | |||||
SCORE 79 Construction of a multi-family dwelling unit -- 5 units -- to be addressed as 4602, 4604, 4606, 4608 and 46 16th street. Aggregate total of 7,551 sf for the five units -- 6562 sf finished, 989 sf unfinished basements (limited to the two end units). 12. 5 bathrooms aggregate total -- one plumbing rough-in in the basement for each unit (optional bath for middle three units -- to be finished sf as inchstorage closetinch). 216 in decks and patio covers. Install a c line sets only -- no a c compressor or a c coils in furnace, separate electric meter for each unit house meter. On-demand direct vent water heater for each unit. Client: Campesina Clinica | Applicant: Martines Palmeiro Construction | Permit type: Building, electrical | Permit status: Co | Current use: Multifamily dwe | |||||
SCORE 56 New utilities infrastructure install for the former peoplefoots clinic site, (pipeline work and services only). To include water and sanitary main extensions, [5] domestic water service, [2] fire service line, [1] irrigation service, [2] sanitary sewer and reconfiguration of storm. Also, track requirements of state stormwater and erosion control compliance. Date: July 11, 2011 Contractor: J And K Pipeline Inc Client: Campesina Clinica | Applicant: J & K Pipeline Inc | Permit type: Fire, water, wastewa | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 79 Permit for tracking of storm water and erosion control compliance as required under state permit #cor-03h734 fees thru 6 2012 paid on pmt2011-02232 Date: July 11, 2011 Contractor: Martines Palmeiro Construction Client: Campesina Clinica | Applicant: Martines Palmeiro Construction | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Place comcast cable for new subdivision. Date: December 5, 2011 Contractor: Comcast Client: Yarmouth 4655.0 | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | Current use: Existing | |||||
Gar Value: $400 Permit type: Residential addition | Permit id: Bp-61-5355 | |||||
2 bedroom addition Value: $4,000 Permit type: Residential addition | Permit id: Bp-63-6466 | |||||
Beauty salon (home occupation) Date: December 12, 1988 Value: $16,548 Permit type: New commercial building | Permit status: Permit closed | Permit id: Bp-88-1371 | |||||
Gar Permit type: Residential addition | Permit id: Bp-61-5355 | |||||
2 bedroom addition Permit type: Residential addition | Permit id: Bp-63-6466 | |||||
Beauty salon (home occupation) Date: December 12, 1988 Permit type: New commercial building | Permit status: Permit closed | Permit id: Bp-88-1371 | |||||
SCORE 100 Service for irrigation meter Date: July 24, 2007 Contractor: Pullenwire, Inc Client: Clinic Peoples | Permit type: Electrical | Permit status: Cmp | Completion date: October 5, 2007 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-03084 | |||||
SCORE 95 Installation of vacuum breaker for sprikler system. Client: For Habitat | Permit type: Plumbing | Permit status: Cmp | Completion date: January 15, 2008 | Permit id: Pmt2007-03702 | |||||
SCORE 79 Construction of a multi-family dwelling unit -- 5 units -- to be addressed as 4602, 4604, 4606, 4608 and 46 16th street. Aggregate total of 7,551 sf for the five units -- 6562 sf finished, 989 sf unfinished basements (limited to the two end units). 12. 5 bathrooms aggregate total -- one plumbing rough-in in the basement for each unit (optional bath for middle three units -- to be finished sf as inchstorage closetinch). 216 in decks and patio covers. Install a c line sets only -- no a c compressor or a c coils in furnace, separate electric meter for each unit + house meter. On-demand direct vent water heater for each unit. Client: Campesina Clinica | Permit type: Building, electrical, mechanical, plumbing, fire, water, wastewater | Permit status: Co | Current use: Multifamily dwellings, new | Permit id: Pmt2011-02044 | |||||
Place comcast cable for new subdivision. Date: December 5, 2011 Client: Yarmouth | Permit type: Right-of-way | Permit status: Iss | Current use: Existing | Permit id: Pmt2011-05256 | |||||