Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Remodel master bathroom - frame new pocket door, replace window, install new corian show pan and tile surrounds, install exhaust fan and new lighting, upgrade outlets to gfci, (toilet and sink locations to swap). Date: June 26, 2012 Contractor: Miltenberger Construction Permit status: Finaled | Permit id: B12-2120 | |||||
SCORE 86 Upgrade panel to 1 amp overhead service from meter socket and subpanel with no disconnect. Date: July 23, 2012 Contractor: North Bay Permits Permit status: Finaled | Permit id: B12-2445 |