RENOVATION HISTORY
Based on the information received from building department, associated with 164 Redmond WAy Redmond, Wa 98052 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Place conduit in trench that has been dug/ placed and backfilled by johanssen or compass and to access two poles on ne 79th street that will either be closed or two flaggers used.
Date:  July 28, 2016

Applicant: Thomas Dacey | Permit type: Right of way | Permit id: Row-2016-06399 | Parcel: 1225059070
2016/07/28095164 Redmond Way Redmond, Wa 98052
A new 6-story mixed-use building with approximately 191 units/ 7 live-work units/ and 5/4 square feet of retail space.
Date:  August 26, 2016

Applicant: Kate Miller | Permit type: Civil site construction permit | Permit id: Site-2016-04494 | Parcel: 1225059070
2016/08/26095164 Redmond Way Redmond, Wa 98052
Emergency follow up - crew called out on 9/1/16 to repair a damaged gas service. Crew retired service at the main on the north side of ne 79th street. One 3x5 hard surface cut. Work completed on 9/1/16.
Date:  September 13, 2016

Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2016-07535 | Parcel: 9999999999
2016/09/13095164 Redmond Way Redmond, Wa 98052
Install of jut/comm trench required for frontier to remove overhead lines at the triangle project and install the lines underground. Work being tracked by citys couplet conversion project and has been referred to as inphase 1 jut workin.
Date:  July 29, 2016

Applicant: Steffenie Evans | Permit type: Right of way | Permit id: Row-2016-06398 | Parcel: 1225059070
2016/07/29095164 Redmond Way Redmond, Wa 98052
Redmond triangle - move temporary service to a new location (out of street). Includes power for (1) tower crane/ (1) dewatering equipment/ and (2) electrical panels. One panel provides power for (3) job trailers and the other panel provides temporary construction power to the building.
Date:  September 29, 2016
Value:   $32,000

Applicant: John Studioso | Permit type: Electrical - otc | Permit id: Elec-2016-08156 | Parcel: 1225059027
2016/09/293200095164 Redmond Way Redmond, Wa 98052
Mu garage- redmond triangle garage - phase i building permit for type ia pedestal building per ibc 510. 2 and using ordinance 2787/ option 1. Structure to include: non-separated uses: 6/989 sf for r-2 occupancy; 77/4 sf of 2 levels below grade and 1 level of at grade s-2 occupancy parking; 4/447 sf s-1 occupancy; 8/3 sf b-occupancy; 945 sf a-3 occupancy; and 5/199 sf m-occupancy for a total of 103/3 gsf (and would allow for future a-2 occupancy). Phase ii will be for type v-a structure above and for canopies.
Date:  September 9, 2016
Value:   $11,657,478

Applicant: Steffenie Evans | Permit type: Mixed use | Permit id: Bldg-2016-03668 | Parcel: 1225059027
2016/09/091165747895164 Redmond Way Redmond, Wa 98052
Revised work description:no new pole at p3 - add terminal and deadend to existing pole. Add riser to existing pole p3 and trench from p3 to newly added padmount transformer at vault v1. Original work description:remove 2 poles @ p1/ p2/ set new pole and transformer bank @ p3. Remove overhead wire from p1 to p2 and p2 to p3. Trench feet from p3 to private property to install underground temporary service.
Date:  July 22, 2016

Applicant: Trina Gallaher | Permit type: Right of way | Permit id: Row-2016-06030 | Parcel: 1225059070
2016/07/22095164 Redmond Way Redmond, Wa 98052
Demo - redmond triangle - parcel a - demolish existing 1-story structure including utilities and all appurtenances. Existing structure is 1/092 sf.
Date:  May 17, 2016
Value:   $7,380

Applicant: Bart Balko | Permit type: Demolition | Permit id: Demo-2016-03491 | Parcel: 1225059070
2016/05/17738095164 Redmond Way Redmond, Wa 98052
Redmond triangle demo dust control - 166th & redmond way
Date:  June 15, 2016

Applicant: Patrick Mccabe | Permit type: Hydrant use | Permit id: Hyd-2016-05071 | Parcel: 1225059070
2016/06/15095164 Redmond Way Redmond, Wa 98052
Plumbing- redmond triangle garage - underground plumbing only/ permit submission for topout plumbing at a later date.
Date:  October 19, 2016
Value:   $35,065

Applicant: Dave Vanduine | Permit type: Plumbing plan review | Permit id: Plum-2016-08145 | Parcel: 1225059027
2016/10/193506595164 Redmond Way Redmond, Wa 98052
Final cap side sewer/ demo - redmond triangle - parcel a - demolish existing 1-story structure including utilities and all appurtenances. Existing structure is 1/092 sf.
Date:  November 28, 2016
Value:   $7,380

Applicant: Alan Deisher | Permit type: Side sewer | Permit id: Swr-2016-06143 | Parcel: 1225059070
2016/11/28738095164 Redmond Way Redmond, Wa 98052
SCORE
82
Redmond triangle - move temporary service to a new location (out of street). Includes power for (1) tower crane (1) dewatering equipment and (2) electrical panels. One panel provides power for (3) job trailers and the other panel provides temporary construction power to the building.
Date:  September 29, 2016
Value:   $32,000

Applicant: John Studioso | Permit type: Electrical - otc | Permit id: Elec-2016-08156 | Parcel: 1225059027
2016/09/293200082164 Redmond Way Redmond, Wa 98052Independent Electrical Contractors Inc
SCORE
88
Mu garage- redmond triangle garage - phase i building permit for type ia pedestal building per ibc 510. 2 and using ordinance 2787 option 1. Structure to include: non-separated uses: 6 989 sf for r-2 occupancy; 77 4 sf of 2 levels below grade and 1 level of at grade s-2 occupancy parking; 4 447 sf s-1 occupancy; 8 3 sf b-occupancy; 945 sf a-3 occupancy; and 5 199 sf m-occupancy for a total of 103 3 gsf (and would allow for future a-2 occupancy). Phase ii will be for type v-a structure above and for canopies.
Date:  September 9, 2016
Value:   $11,657,478

Applicant: Steffenie Evans | Permit type: Mixed use | Permit id: Bldg-2016-03668 | Parcel: 1225059027
2016/09/091165747888164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
SCORE
88
Demo - redmond triangle - parcel a - demolish existing 1-story structure including utilities and all appurtenances. Existing structure is 1 092 sf.
Date:  May 17, 2016
Value:   $7,380

Applicant: Bart Balko | Permit type: Demolition | Permit id: Demo-2016-03491 | Parcel: 1225059070
2016/05/17738088164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
SCORE
88
Redmond triangle demo dust control - 166th & redmond way
Date:  June 15, 2016

Applicant: Patrick Mccabe | Permit type: Hydrant use | Permit id: Hyd-2016-05071 | Parcel: 1225059070
2016/06/15088164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
Install of jut comm trench required for frontier to remove overhead lines at the triangle project and install the lines underground. Work being tracked by citys couplet conversion project and has been referred to as inphase 1 jut workin.
Date:  July 29, 2016

Applicant: Steffenie Evans | Permit type: Right of way | Permit id: Row-2016-06398 | Parcel: 1225059070
2016/07/29095164 Redmond Way Redmond, Wa 98052
Place conduit in trench that has been dug placed and backfilled by johanssen or compass and to access two poles on ne 79th street that will either be closed or two flaggers used.
Date:  July 28, 2016

Applicant: Thomas Dacey | Permit type: Right of way | Permit id: Row-2016-06399 | Parcel: 1225059070
2016/07/28095164 Redmond Way Redmond, Wa 98052
Revised work description:no new pole at p3 - add terminal and deadend to existing pole. Add riser to existing pole p3 and trench from p3 to newly added padmount transformer at vault v1. Original work description:remove 2 poles @ p1 p2 set new pole and transformer bank @ p3. Remove overhead wire from p1 to p2 and p2 to p3. Trench feet from p3 to private property to install underground temporary service.
Date:  July 22, 2016

Applicant: Trina Gallaher | Permit type: Right of way | Permit id: Row-2016-06030 | Parcel: 1225059070
2016/07/22095164 Redmond Way Redmond, Wa 98052
A new 6-story mixed-use building with approximately 191 units 7 live-work units and 5 4 square feet of retail space.
Date:  August 26, 2016

Applicant: Kate Miller | Permit type: Civil site construction permit | Permit id: Site-2016-04494 | Parcel: 1225059070
2016/08/26095164 Redmond Way Redmond, Wa 98052
Emergency follow up - crew called out on 9 1 16 to repair a damaged gas service. Crew retired service at the main on the north side of ne 79th street. One 3x5 hard surface cut. Work completed on 9 1 16.
Date:  September 13, 2016

Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2016-07535 | Parcel: 9999999999
2016/09/13095164 Redmond Way Redmond, Wa 98052
SCORE
99
Plumbing- redmond triangle garage - underground plumbing only permit submission for topout plumbing at a later date.
Date:  October 19, 2016
Value:   $35,065

Applicant: Dave Vanduine | Permit type: Plumbing plan review | Permit id: Plum-2016-08145 | Parcel: 1225059027
2016/10/193506599164 Redmond Way Redmond, Wa 98052Tristate Plumbing Inc
Final cap side sewer demo - redmond triangle - parcel a - demolish existing 1-story structure including utilities and all appurtenances. Existing structure is 1 092 sf.
Date:  November 28, 2016
Value:   $7,380

Applicant: Alan Deisher | Permit type: Side sewer | Permit id: Swr-2016-06143 | Parcel: 1225059070
2016/11/28738095164 Redmond Way Redmond, Wa 98052
SCORE
82
Redmond triangle - move temporary service to a new location (out of street). Includes power for (1) tower crane (1) dewatering equipment and (2) electrical panels. One panel provides power for (3) job trailers and the other panel provides temporary construction power to the building.
Date:  September 29, 2016
Value:   $32,000

Applicant: John Studioso | Permit type: Electrical - otc | Permit id: Elec-2016-08156
2016/09/293200082164 Redmond Way Redmond, Wa 98052Independent Electrical Contractors Inc
SCORE
88
Demo - redmond triangle - parcel a - demolish existing 1-story structure including utilities and all appurtenances. Existing structure is 1 092 sf.
Date:  May 17, 2016
Value:   $7,380

Applicant: Bart Balko | Permit type: Demolition | Permit id: Demo-2016-03491
2016/05/17738088164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
SCORE
88
Redmond triangle demo dust control - 166th & redmond way
Date:  June 15, 2016

Applicant: Patrick Mccabe | Permit type: Hydrant use | Permit id: Hyd-2016-05071
2016/06/15088164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
SCORE
88
Mu garage- redmond triangle garage - phase i building permit for type ia pedestal building per ibc 510. 2 and using ordinance 2787 option 1. Structure to include: non-separated uses: 6 989 sf for r-2 occupancy; 77 4 sf of 2 levels below grade and 1 level of at grade s-2 occupancy parking; 4 447 sf s-1 occupancy; 8 3 sf b-occupancy; 945 sf a-3 occupancy; and 5 199 sf m-occupancy for a total of 103 3 gsf (and would allow for future a-2 occupancy). Phase ii will be for type v-a structure above and for canopies.
Date:  September 9, 2016
Value:   $11,657,478

Applicant: Steffenie Evans | Permit type: Mixed use | Permit id: Bldg-2016-03668
2016/09/091165747888164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
SCORE
99
Plumbing- redmond triangle garage - underground plumbing only permit submission for topout plumbing at a later date.
Date:  October 19, 2016
Value:   $35,065

Applicant: Dave Vanduine | Permit type: Plumbing plan review | Permit id: Plum-2016-08145
2016/10/193506599164 Redmond Way Redmond, Wa 98052Tristate Plumbing Inc
SCORE
100
Fire alarm- redmond triangle- install new fire alarm system to include 1 ea facp 12ea booster supply panels 1 ea remote annunciator 116ea smoke detectors 3ea heat detectors 23ea pull stations 9ea relays 4ea monitor modules 10ea magnetic door holders 166ea horn strobes 22ea strobes 189ea mini-horns 213ea low frequency horns.
Date:  April 27, 2017

Applicant: Ronie Dunlap | Permit type: Fire alarm | Permit id: Fire-2016-09115
2017/04/270100164 Redmond Way Redmond, Wa 98052Froula Alarm Systems Inc
SCORE
82
Redmond triangle - electrical wiring trim fixtures service and low voltage systems (communications access control cctv) for a new 195 unit mixed-use project. Fire alarm system life safety systems to be on a separate permit. Includes (211) feeders (1) ground ufer (1) low voltage wiring (2) service new and (208) sub-panels.
Date:  January 25, 2017
Value:   $2,653,990

Applicant: Rich Crawford | Permit type: Electrical - otc | Permit id: Elec-2017-00553
2017/01/25265399082164 Redmond Way Redmond, Wa 98052Independent Electrical Contractors Inc
Occupy eb wb lanes to install new 2-inch pe service to 164 redmond way. One 3x5 cuts anticipated.
Date:  August 1, 2017

Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2017-05493 | Parcel: 1225059027
2017/08/01095164 Redmond Way Redmond, Wa 98052
Install pm transformer install jbox replace oh wire 3 feet x 4 feet asphalt cut to install new ug service.
Date:  August 2, 2017

Applicant: Trina Gallaher | Permit type: Right of way | Permit id: Row-2017-04405 | Parcel: 1225059027
2017/08/02095164 Redmond Way Redmond, Wa 98052
SCORE
74
Redmond triangle - installation of a new fire sprinkler system for a new mixed use project. Includes a total of (2183) heads (1) riser supply and (1) standpipe.
Date:  September 28, 2017

Applicant: Leon Fragione | Permit type: Fire sprinkler - commercial | Permit id: Fire-2017-03067 | Parcel: 1225059027
2017/09/28074164 Redmond Way Redmond, Wa 98052Fire Protection Systems
SCORE
82
Redmond triangle - electrical wiring trim fixtures service and low voltage systems (communications access control cctv) for a new 195 unit mixed-use project. Fire alarm system life safety systems to be on a separate permit. Includes (211) feeders (1) ground ufer (1) low voltage wiring (2) service new and (208) sub-panels.
Date:  January 25, 2017
Value:   $2,653,990

Applicant: Rich Crawford | Permit type: Electrical - otc | Permit id: Elec-2017-00553 | Parcel: 1225059027
2017/01/25265399082164 Redmond Way Redmond, Wa 98052Independent Electrical Contractors Inc
SCORE
99
Redmond triangle - installation of gas piping only for redmond triangle. Gas piping to hwt on level 1 fireplace range bbqs on level 2 & (2) hvac units on roof. Customer paid for (8) gas piping only and (5) gas water heater.
Date:  June 27, 2017
Value:   $16,000

Applicant: Dave Vanduine | Permit type: Mechanical plan review | Permit id: Mech-2017-01187
2017/06/271600099164 Redmond Way Redmond, Wa 98052Tristate Plumbing Inc
SCORE
100
Redmond triangle - furnish and install duct work only for bath fans dryers and microwaves in each living unit routed horizontally to the exterior walls. Paid for 195 ventilation systems(not part of heating or ac system.
Date:  November 22, 2017
Value:   $120,000

Applicant: Kyle Lipe | Permit type: Mechanical plan review | Permit id: Mech-2017-07869
2017/11/22120000100164 Redmond Way Redmond, Wa 98052Pacific One Construction Inc
SCORE
99
Redmond triangle - installation of plumbing top out for the redmond triangle project. Customer paid for (2) backflow preventer (225) bathtub (195) clothes washers (198) dishwashers (1) drinking fountain (19) floor drain (195) garbage disposal (14) hose bibs (1) irrigation system (76) roof drain (1) shower valve replacement (234) bathroom sinks (198) kitchen sinks (1) utility sinks (237) toilets (3) urinals. 16 total fixtures
Date:  June 27, 2017
Value:   $2,248,000

Applicant: Dave Vanduine | Permit type: Plumbing plan review | Permit id: Plum-2017-01189
2017/06/27224800099164 Redmond Way Redmond, Wa 98052Tristate Plumbing Inc
SCORE
100
Comm mech - redmond triangle apartments - installation of garage transformer vault trash room storage rooms corridor ventilation common are ventilation and hvac. Elevator machine room hvac and elevator reliefs. All screening shall match existing bldg in color design and materials.
Date:  June 29, 2017
Value:   $351,000
Contractor: Emerald Aire Inc

Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-03144
2017/06/29351000100164 Redmond Way Redmond, Wa 98052Emerald Aire Inc
SCORE
99
Removal of ust - 1 gallons
Date:  May 4, 2017

Applicant: Tom Wise | Permit type: Fire single-use | Permit id: Fire-2017-03194
2017/05/04099164 Redmond Way Redmond, Wa 98052Johansen Excavating Inc
SCORE
88
Phase ii permit for the type v-a building on top of the pedestal building (pedestal under permit bldg-2016-03668) per ibc 510. 2 and using ordinance 2787 option 1. Structure to include 188 r-2 dwelling units in 171 909 gsf; 635 gsf amenity space: 2 6 gsf exterior courtyard amenity space; 3 458 gsf covered decks; 1 682 gsf uncovered decks; 5 026 gsf canopies for a total of 185 3 gsf. (note: (7) r-2 units are in the i-a portion of structure. A total of 195 units overall)
Date:  February 23, 2017
Value:   $19,351,867

Applicant: Steffenie Evans | Permit type: Mixed use | Permit id: Bldg-2016-04608
2017/02/231935186788164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
SCORE
88
Phase ii permit for the type v-a building on top of the pedestal building (pedestal under permit bldg-2016-03668) per ibc 510. 2 and using ordinance 2787 option 1. Structure to include 188 r-2 dwelling units in 171 909 gsf; 635 gsf amenity space: 2 6 gsf exterior courtyard amenity space; 3 458 gsf covered decks; 1 682 gsf uncovered decks; 5 026 gsf canopies for a total of 185 3 gsf. (note: (7) r-2 units are in the i-a portion of structure. A total of 195 units overall)
Date:  February 23, 2017
Value:   $19,351,867

Applicant: Steffenie Evans | Permit type: Mixed use | Permit id: Bldg-2016-04608 | Parcel: 1225059027
2017/02/231935186788164 Redmond Way Redmond, Wa 98052Compass General Construction I Llc
SCORE
100
Fire alarm- redmond triangle- install new fire alarm system to include 1 ea facp 12ea booster supply panels 1 ea remote annunciator 116ea smoke detectors 3ea heat detectors 23ea pull stations 9ea relays 4ea monitor modules 10ea magnetic door holders 166ea horn strobes 22ea strobes 189ea mini-horns 213ea low frequency horns.
Date:  April 27, 2017

Applicant: Ronie Dunlap | Permit type: Fire alarm | Permit id: Fire-2016-09115 | Parcel: 1225059027
2017/04/270100164 Redmond Way Redmond, Wa 98052Froula Alarm Systems Inc
SCORE
99
Removal of ust - 1 gallons
Date:  May 4, 2017

Applicant: Tom Wise | Permit type: Fire single-use | Permit id: Fire-2017-03194 | Parcel: 1225059027
2017/05/04099164 Redmond Way Redmond, Wa 98052Johansen Excavating Inc
SCORE
100
Redmond triangle - furnish and install duct work only for bath fans dryers and microwaves in each living unit routed horizontally to the exterior walls. Paid for 195 ventilation systems(not part of heating or ac system.
Date:  November 22, 2017
Value:   $120,000

Applicant: Kyle Lipe | Permit type: Mechanical plan review | Permit id: Mech-2017-07869 | Parcel: 1225059027
2017/11/22120000100164 Redmond Way Redmond, Wa 98052Pacific One Construction Inc
SCORE
100
Comm mech - redmond triangle apartments - installation of garage transformer vault trash room storage rooms corridor ventilation common are ventilation and hvac. Elevator machine room hvac and elevator reliefs. All screening shall match existing bldg in color design and materials.
Date:  June 29, 2017
Value:   $351,000
Contractor: Emerald Aire Inc

Applicant: Miranda Mendez | Permit type: Mechanical plan review | Permit id: Mech-2017-03144 | Parcel: 1225059070
2017/06/29351000100164 Redmond Way Redmond, Wa 98052Emerald Aire Inc
SCORE
99
Redmond triangle - installation of gas piping only for redmond triangle. Gas piping to hwt on level 1 fireplace range bbqs on level 2 & (2) hvac units on roof. Customer paid for (8) gas piping only and (5) gas water heater.
Date:  June 27, 2017
Value:   $16,000

Applicant: Dave Vanduine | Permit type: Mechanical plan review | Permit id: Mech-2017-01187 | Parcel: 1225059027
2017/06/271600099164 Redmond Way Redmond, Wa 98052Tristate Plumbing Inc
SCORE
99
Redmond triangle - installation of plumbing top out for the redmond triangle project. Customer paid for (2) backflow preventer (225) bathtub (195) clothes washers (198) dishwashers (1) drinking fountain (19) floor drain (195) garbage disposal (14) hose bibs (1) irrigation system (76) roof drain (1) shower valve replacement (234) bathroom sinks (198) kitchen sinks (1) utility sinks (237) toilets (3) urinals. 16 total fixtures
Date:  June 27, 2017
Value:   $2,248,000

Applicant: Dave Vanduine | Permit type: Plumbing plan review | Permit id: Plum-2017-01189 | Parcel: 1225059027
2017/06/27224800099164 Redmond Way Redmond, Wa 98052Tristate Plumbing Inc
SCORE
74
Redmond triangle - installation of a new fire sprinkler system for a new mixed use project. Includes a total of (2183) heads (1) riser supply and (1) standpipe.
Date:  September 28, 2017

Applicant: Leon Fragione | Permit type: Fire sprinkler - commercial | Permit id: Fire-2017-03067
2017/09/28074164 Redmond Way Redmond, Wa 98052Fire Protection Systems
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.