Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Install foundation drain three (3) floor drains and a sump pit with basin Date: April 17, 2017 Contractor: Z B Z And Associates Inc Client: School Board Hampton | Client Address: 1 Franklin Sthampton, Va 23669 | Permit status: Finaled | Current use: Commercial | Permit id: P17-00244 | |||||
SCORE 72 Replace existing stage lights approximately new fixtures per plans Date: April 17, 2017 Contractor: David R Hall, Inc Client: School Board Hampton | Client Address: 1 Franklin Sthampton, Va 23669 | Permit status: Finaled | Current use: Commercial | Permit id: E17-00407 | |||||
SCORE 59 Interior auditorium repairs including lighting, sound, seating and finishes. Auditorium alterations Date: January 27, 2017 Contractor: Oyster Point Construction Co Client: School Board Hampton | Client Address: 1 Franklin Sthampton, Va 23669 | Permit status: Finaled | Current use: Institutional | Permit id: B16-00774 | |||||
SCORE 82 Removal and disposal of asbestos floor tile and mastic in ten classrooms and the auditorium. Date: June 22, 2016 Contractor: Waco Inc Client: School Board Hampton | Client Address: 1 Franklin Sthampton, Va 23669 | Permit status: Finaled | Current use: Institutional | Permit id: B16-00674 |