Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 80 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 7 1 13: plan change to add electrical upgrade to 2 amps... M1a Date: June 28, 2013 Contractor: Omar Baha Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: August 13, 2013 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 7/1/13 plan change to add electrical upgrade to 2 amps... M1a Date: June 28, 2013 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 13, 2013 | Permit id: Pds2013-Resalt- |