Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: January 29, 2015 Client: Tripodi John L | Permit status: Completed | Permit id: 587448 | |||||
Electrical permit Date: January 26, 2015 Client: Tripodi John L | Permit status: Completed | Permit id: 586370 | |||||
Alteration permit Date: January 29, 2015 Client: Tripodi John L | Permit status: Completed | Permit id: 587448 | |||||
Electrical permit Date: January 26, 2015 Client: Tripodi John L | Permit status: Completed | Permit id: 586370 | |||||
SCORE 100 Relocate (6) existing light fixtures on to drop ceiling within commercial space.... In accordance with 2008 nec Date: January 26, 2015 Contractor: Ar Electric Llc Client: Tripodi John L | Permit type: Electrical permit | Permit status: Completed | Completion date: June 9, 2015 | Permit id: 586370 | |||||
SCORE 99 Stucco_-_exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Level 1 alteration: shall comply with the provisions of chapter 6 of the international existing building code. To include the removal and replacement or the covering of existing materials, elements, equipment or fixtures. Contact inspector at district office prior to starting work. Separate permits required for plumbing, electric and hvac. Date: January 29, 2015 Contractor: Charles Deitz Jr Client: Tripodi John L | Permit type: Alteration permit | Permit status: Completed | Completion date: June 16, 2016 | Permit id: 587448 |