Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: September 21, 2016 Client: Beyha Fawwaz | Permit status: Active | Permit id: 723592 | |||||
Alteration permit Date: September 14, 2016 Client: Beyha Fawwaz | Permit status: Active | Permit id: 722003 | |||||
Demolition permit Date: January 18, 2017 Client: Beyha Fawwaz | Permit status: Active | Permit id: 752679 | |||||
SCORE 100 Install 60,0 of btu of heat on 2nd fl with 2 tons of a c,install 60,0 btu of heat, 2 1 2 tons of a c with related duct work Date: March 7, 2017 Contractor: Timothy Mckenna Client: Beyha Fawwaz | Permit type: Mechanical permit | Permit status: Expired | Completion date: May 31, 2017 | Permit id: 762094 | |||||
SCORE 89 For the erection of a roof deck at the 2nd floor rear, accessed from 2nd floor rear and a roof deck at the 3rd floor rear accessed from 3rd floor rear as per details shown on the attached plan. Size and locations as per plan approved under zoning permit 758701. No other work included in this permit application. Date: May 26, 2017 Contractor: Fawwaz Rhone Client: Beyha Fawwaz | Permit type: Alteration permit | Permit status: Expired | Completion date: June 1, 2017 | Permit id: 775084 | |||||
SCORE 89 Application is for the underpinning of foundation to lower the basement floor to make it a habitable space including erection of an egress well. Details as shown on the attached plan. No other work included in this permit application. Shoring shall be provided prior to excavation of the basement for underpinning and shall be done under the supervision of the professional engineer responsible. Date: April 13, 2017 Contractor: Fawwaz Rhone Client: Beyha Fawwaz | Permit type: Alteration permit | Permit status: Completed | Completion date: June 1, 2017 | Permit id: 761578 | |||||
SCORE 89 Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. No load bearing framing allowed under this permit Date: September 21, 2016 Contractor: Fawwaz Rhone Client: Beyha Fawwaz | Permit type: Alteration permit | Permit status: Active | Completion date: June 12, 2017 | Permit id: 723592 | |||||
SCORE 89 Interior demo of non-load bearing walls only, no structural work on this permit Date: January 18, 2017 Contractor: Espana Brothers Client: Beyha Fawwaz | Permit type: Demolition permit | Permit status: Expired | Completion date: November 10, 2017 | Permit id: 752679 | |||||
SCORE 100 200amp service and rewire including receptacles,switches,fixtures,smokes combo per 2008 nec (sfd)south district Date: February 1, 2017 Contractor: Willie Welcome Client: Beyha Fawwaz | Permit type: Electrical permit | Permit status: Expired | Completion date: February 1, 2017 | Permit id: 756038 | |||||
SCORE 100 Ez plumbing standards - plumbing alterations throughout an existing single family dwelling. 3 toilets, 2 bathtubs, 3 lavatories, 1 kitchen sink, 1 laundry sink, 1 dishwasher, 1 garbage disposer Date: February 10, 2017 Contractor: Superior Build Maintenance Client: Beyha Fawwaz | Permit type: Plumbing permit | Permit status: Expired | Completion date: May 31, 2017 | Permit id: 758323 | |||||
SCORE 89 Add rear decks to rear landings. One off of 2nd floor landing. One off 3rd floor landing Date: March 29, 2017 Contractor: Fawwaz Rhone Client: Beyha Fawwaz | Permit type: Zoning permit | Permit status: Completed | Completion date: May 25, 2017 | Permit id: 758701 | |||||
SCORE 89 Framing, drywall, floors, doors and windows Date: September 14, 2016 Contractor: Fawwaz Rhone Client: Beyha Fawwaz | Permit type: Alteration permit | Permit status: Expired | Completion date: May 31, 2017 | Permit id: 722003 |