Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 On the first floor: - renovating and moving the kitchen to a new location - renovating and moving the bathroom under the existing stairs, - laying hardwood flooring, - laying ceramic tile, - removing existing non-load bearing walks to open up the first floor, - add recess lighting in main living area and kitchen on second floor: - laying new carpet, - renovating existing bathroom and not moving toilet or shower, - moving a non-load bearing wall to build a closet in a bedroom, - adding a bathroom with toilet, sink and shower in bedroom, - add recess lighting in bedrooms, entire home: - painting, - replacing lighting fixtures. Date: May 17, 2017 Contractor: Charbel C Makhoul Client: Charbel Makhoul | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1707496 | |||||
SCORE 59 Building Date: March 16, 2017 Contractor: Charbel C Makhoul Client: Charbel C. Makhoul & Youssef Sakr | Permit status: Permit issued | Permit id: Bp1702222 | |||||
SCORE 82 Electrical Date: March 28, 2017 Contractor: Ralph E. Threatt Client: Charlotte E Sanford | Permit status: Completed | Permit id: E1705042 | |||||
SCORE 100 Plumbing and gas Date: March 28, 2017 Contractor: Jerone Scott Client: Charlotte E Sanford | Permit status: Completed | Permit id: P1704718 |