Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 83 Remove existing tub sink/vanity toilet tile floor and wall tile and legally dispose of same. Repair/replace any rotted or unusable wall or floor substrate. Remove baseboard radiator and install recessed wall radiator. Frame the left side wall area for a walk-in shower complete w/ a bench seat. Install new plumbing for new shower and tie into existing water supply and drainage pipes. Furnish and install water supply and drainage pipes. Furnish and install a new tub on right side of bathroom. Configure existing plumbing to conform to new tub. Furnish and install new floor and wall tile. Furnish and install new toilet sink/vanity and replace any suspect plumbing pipes etc. Prep ceiling and wall areas not covered with tile for painting. Permit type: Renovations -interio | Permit status: Expired | Current use: 1-2fam | Permit id: Sf163290 | Parcel: 2003192000 | |||||
SCORE 97 Plumbing bathroom Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl172918 | Parcel: 2003192000 | |||||
SCORE 100 Bathroom renovation 4 swithes 2 outlets 1 fan/light 2 circuits Permit type: Electrical | Permit status: Expired | Current use: 1-2fam | Permit id: E172742 | Parcel: 2003192000 |