Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: October 31, 2016 Client: Dacado Llc | Permit status: Completed | Permit id: 733048 | |||||
For the complete demolition of the exisitng detached structure. For use as a vacant lot (use registration permit required prior to use of lot). Date: February 2, 2017 Client: Acado Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 2, 2017 | Permit id: 738548 | |||||
SCORE 70 For the complete demolition of an existing, detached, two (2) story structure. Structure to be demolished by hand until it is a height of ft of less, at that time, mechanical demolition is permitted. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. A covered walkway or sidewalk closure shall be required within 13 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice required per a-303. 2. Date: February 2, 2017 Contractor: J D Fedele Construction Demo Client: Acado Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: March 22, 2017 | Permit id: 738547 | |||||
SCORE 100 Seal 5" lateral-pa1#20163050443-"self certification no longer accepted all trenches in excess of 5 ft must have approved shoring at the time of inspection". Date: October 31, 2016 Contractor: Mr Ds Plumbing And Heating Client: Acado Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 22, 2016 | Permit id: 733048 |