Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition of rectory interior for renovation as designed under long form permit alt-10262 currently under review before the zba and article 32 approvals. All work will be in compliance with cmr 7 527 521 and the boston fire code. Date: January 25, 2010 Value: $100,000 Permit type: Demolition - interio | Permit status: Expired | Current use: 1-2fam | Permit id: Sf12132 | |||||
Install new sprinkler system consisting of (507) new heads attached rectory to be protected with 2-zones (1 wet &; 1 dry) attic space to contain a single common dry zone to protect above the main ceiling as well as below (entry level) floors 1-7 Date: July 20, 2010 Permit status: Na | Permit id: Sprk33324 | |||||
SCORE 100 Temporary bagging of smoke detectors for dust control during construction Date: May 31, 2011 Contractor: Regina Olivieri Shawmut Design And Construction Permit status: Na | Permit id: Bsd78659 | |||||
Temporary bagging of smoke detectors for dust control from demolition work Date: December 17, 2010 Permit status: Na | Permit id: Bsd55902 | |||||
Renovation / demolition of church to include interior finishes walls ceilings and floors Date: May 27, 2011 Permit status: Na | Permit id: Fdc78532 | |||||
Install new fire alarm system consisting of fa panel speaker strobes pull station rai beam and smoke detectors for st cecilias church renovations doc#20100504 Date: November 23, 2010 Permit status: Na | Permit id: Bfdf52910 | |||||
Short form bldg permit Date: January 25, 2010 Value: $100,000 Permit type: Demolition - interior | Current use: 1-2fam | Permit id: Sf12132 | |||||
SCORE 100 Church c/o-for church rectory bsmt addiding;offices - lower level-only alt 10262 issued 7/9/ temporary certificate-expires - 9/10/2011-pending completion of permit Date: August 17, 2011 Contractor: Regina Olivieri Permit status: Expired | Current use: Comm | Permit id: Coo90196 | |||||
SCORE 93 Remove small area of ceiling to provide access to hvac system. Repairs to hvac system. Reinstallation of ceiling and plaster after hvac work is complete. Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf361033 | |||||
SCORE 100 Demolition of existing building (3 floors) down to the foundation. Permit type: Demolition - exterior | Permit status: Expired | Current use: Other | Permit id: Sf27624 | |||||
SCORE 99 Berklee school of music has requested devine technology partners to install 33 category 6 cables for their network in addition we have been asked to run a multi-mode fiber cable to run to a line of sight satellite dish. Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv87274 | |||||
SCORE 100 Area of upper church to remain existing. This area has been removed from the original scope of work. All work in conjuction to alt 10262 - st. Cecilias church. Date: July 13, 2011 Contractor: Regina Olivieri Permit type: Other | Permit status: Expired | Current use: Other | Permit id: A83997 | |||||
SCORE 82 Addition av receway locations and speakers on the lower level (3) speakers Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E82399 | |||||
SCORE 100 Church rectory bsmt 1-5 6 7th fls alt 10262 issued 7/9/ temporary certificate-expires - 7/23/2011-pending completion of permit Date: May 27, 2011 Contractor: Regina Olivieri Permit status: Expired | Current use: Comm | Permit id: Coo78273 | |||||
SCORE 97 Install a new roof deck x 25 @ 5th floor level Permit type: Renovations - exterior | Permit status: Expired | Current use: Mixed | Permit id: Alt168105 | |||||
SCORE 79 Expand 2 curb cuts - resurface handicapped exit in st. Cecilias church parking lot. Submitted:;2 sets of plans. Permit type: Other | Permit status: Expired | Current use: Other | Permit id: U4921177 | |||||
SCORE 100 Church temporary certificate-expires - 3/9/2011- second extention; expires -5/4/2011- third extention -expires -6/3/2011pending completion of permit alt 10262 issued 7/19/10 Date: December 10, 2010 Contractor: Regina Olivieri Permit status: Expired | Current use: Comm | Permit id: Coo55014 | |||||
SCORE 100 Electrical renovation to st cecilias church Permit type: Electrical | Permit status: Expired | Current use: Mixed | Permit id: E22720 | |||||
SCORE 100 Interior ful gut renovation of lower church: new restrooms serving kitcheinfire protection systems new ada access. Interior restoration of upper church; new hvac life safety systems interior finishes new stair egress elevator. All work in compliance with cmr 780-7th edition crm 527 521. Exterior restoration demolition of existing addition to add ada compliant access to church. All work will be in comppliance with the plans approved by the boston landmarks commission. As per plans filed plans are here @lpr Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Alt10262 | |||||
SCORE 100 Legal use and occupancy is; rectory church classrooms parish hall and kitchen. Certificate of use and occupancy for rectory church classrooms offices parish hall and kitchen. Alt10262 issued july 9 2010;bzc-30402 Permit status: Expired | Permit id: Coo93119 | |||||
SCORE 100 Fire alarm install for renovations to saint cecilias church Permit type: Electrical | Permit status: Expired | Current use: Mixed | Permit id: Efa22738 | |||||
SCORE 91 Replace 47 windows with new pella designer series double hung replacement windows in existing openings Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Sf385122 |