Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. ![]() ![]() Permit type: Electrical : 8003 - | Permit status: Permit issued | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. ![]() ![]() Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2014-Resalt- | |||||
SCORE 93 19 sqft re-roof if a re-roof project is proposed, the following specifications apply. Existing roofing material tpo proposed roofing material tpo manufacturer gaf brand and model everguard color (if cool roof required) 0676-0001 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: June 7, 2017 | Permit id: Pds2017-Resalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2005-1006-20 | |||||
Foundation/steel/holdowns/abs/2nd ![]() Permit status: Pass | Permit id: Pds2005-1006-20 |