Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-04) located in the parking lane of 34th street nw, east of the listed property (1512 34th st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids). In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The work will take up to 1 week to complete and will require 24/7 occupancy Date: September 23, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116467 | |||||
SCORE 86 Moving truck Date: January 27, 2016 Contractor: Suddath International Permit status: Withdrawn | Expiration date: February 11, 2016 | Permit id: Pa10227895 | |||||
SCORE 86 Moving truck Date: February 3, 2016 Contractor: Suddath International Permit status: Permit expired | Expiration date: February 17, 2016 | Permit id: Pa10229318 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-04) located in the parking lane of 34th street nw, east of the listed property (1512 34th st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids). In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The work will take up to 1 week to complete and will require 24 7 occupancy Date: September 23, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa116467 | |||||
SCORE 56 Moving truck Date: April 19, 2013 Contractor: Ashton Valente Permit status: Permit expired | Expiration date: April 30, 2013 | Permit id: Pa10093682 | |||||
SCORE 76 Other reserved parking Date: July 10, 2013 Contractor: Richard Warner Permit status: Permit expired | Expiration date: August 9, 2013 | Permit id: Pa10105054 | |||||
SCORE 65 Moving truck Date: July 21, 2013 Contractor: Cullen Sandeen Permit status: Permit expired | Expiration date: August 10, 2013 | Permit id: Pa10106773 | |||||
SCORE 65 Moving truck Date: January 2, 2014 Contractor: Cullen Sandeen Permit status: Permit expired | Expiration date: January 4, 2014 | Permit id: Pa10125981 | |||||
SCORE 76 Moving truck Date: July 17, 2014 Contractor: Richard Warner Permit status: Permit expired | Expiration date: August 4, 2014 | Permit id: Pa10150642 | |||||
SCORE 96 Moving truck Date: August 14, 2014 Contractor: Secor Group Permit status: Permit expired | Expiration date: August 19, 2014 | Permit id: Pa10155255 | |||||
SCORE 99 Construction staging area Date: October 22, 2015 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: December 5, 2015 | Permit id: Pa10215657 | |||||
SCORE 99 Construction staging area Date: January 4, 2016 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: January 31, 2016 | Permit id: Pa10224145 | |||||
SCORE 89 Moving truck Date: January 29, 2016 Contractor: Suddath Relocation Fl Permit status: Permit expired | Expiration date: February 12, 2016 | Permit id: Pa10228449 | |||||
SCORE 100 Moving truck Date: March 17, 2016 Contractor: Quality Services Moving Permit status: Permit expired | Expiration date: March 23, 2016 | Permit id: Pa10235247 | |||||
SCORE 69 Moving truck Date: February 12, 2016 Contractor: Olivier Cattaneo Permit status: Permit expired | Expiration date: February 25, 2016 | Permit id: Pa10230607 | |||||
SCORE 98 Moving truck Date: April 20, 2017 Contractor: Peter Thompson Permit status: Permit expired | Expiration date: April 28, 2017 | Permit id: Pa10396620 |