Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: July 18, 2016 Client: Frankford Monthly Meeting | Permit status: Active | Permit id: 694191 | |||||
Mechanical permit Date: May 17, 2016 Client: Frankford Monthly Meeting | Permit status: Active | Permit id: 692590 | |||||
Alteration permit Date: May 3, 2016 Client: Frankford Monthly Meeting | Permit status: Active | Permit id: 678410 | |||||
Plumbing permit Date: May 13, 2016 Client: Frankford Monthly Meeting | Permit status: Active | Permit id: 691727 | |||||
Use permit Date: April 11, 2016 Client: Frankford Monthly Meeting | Permit status: Completed | Permit id: 683101 | |||||
Demolition permit Date: April 18, 2016 Client: Frankford Monthly Meeting | Permit status: Active | Permit id: 685156 | |||||
Mechanical permit Date: May 17, 2016 Client: Frankford Monthly Meeting | Permit status: Completed | Permit id: 692590 | |||||
Use permit Date: April 11, 2016 Client: Frankford Monthly Meeting | Permit status: Completed | Permit id: 683101 | |||||
Demolition permit Date: April 18, 2016 Client: Frankford Monthly Meeting | Permit status: Completed | Permit id: 685156 | |||||
Plumbing permit Date: May 13, 2016 Client: Frankford Monthly Meeting | Permit status: Completed | Permit id: 691727 | |||||
Alteration permit Date: May 3, 2016 Client: Frankford Monthly Meeting | Permit status: Completed | Permit id: 678410 | |||||
Electrical permit Date: July 18, 2016 Client: Frankford Monthly Meeting | Permit status: Completed | Permit id: 694191 | |||||
Removal of int partitions and construction of new restroom and classrooms on the 2nd floor and residence on the third floor Date: July 18, 2017 Client: Frankford Monthly Meeting | Permit type: Alteration permit | Permit status: Active | Completion date: September 6, 2017 | Permit id: 796938 | |||||
Use of (2nd) floor as an educational facility, use of (3rd) floor as a single family dwelling in an existing building. All previously approved uses on first and basement levels remain. No signs on this permit. Date: July 3, 2017 Client: Frankford Monthly Meeting | Permit type: Use permit | Permit status: Completed | Completion date: July 3, 2017 | Permit id: 796942 | |||||
SCORE 100 Install new fire suppression system complying with nfpa 13 throughout the building to include 2" main fire service line and 2-1 2" wilkins 350a backflow prevention assembly as per approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. Date: September 6, 2017 Contractor: B. M. Consulting Services Inc Client: Frankford Monthly Meeting | Permit type: Suppression permit | Permit status: Active | Completion date: September 13, 2017 | Permit id: 811176 | |||||
SCORE 100 Replace stack,toilet,lav,laundry tub and drinking fountain. The installation will comply with the philadephia plubming code 2004 Date: September 26, 2017 Contractor: Excel Plumbing Heating Ac Inc Client: Frankford Monthly Meeting | Permit type: Plumbing permit | Permit status: Active | Completion date: September 26, 2017 | Permit id: 819228 | |||||
SCORE 93 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: September 28, 2017 Contractor: Excel Plumbing Heating And Air Client: Frankford Monthly Meeting | Permit type: Mechanical permit | Permit status: Active | Completion date: September 28, 2017 | Permit id: 819263 | |||||
SCORE 100 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: April 18, 2016 Contractor: David H Davidson Client: Frankford Monthly Meeting | Permit type: Demolition permit | Permit status: Completed | Completion date: October 7, 2016 | Permit id: 685156 | |||||
SCORE 100 Re-rough toilet,lav,ks existing add 2nd toilet and lav and parital stack (educational facility)the installation will comply with the philadelphia plumbing code 2004 Date: May 13, 2016 Contractor: Excel Plumbing Heating Ac Inc Client: Frankford Monthly Meeting | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 7, 2016 | Permit id: 691727 | |||||
SCORE 93 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. One unit 80, btu; 3ton; 95% efficiency unit Date: May 17, 2016 Contractor: Excel Plumbing Heating And Air Client: Frankford Monthly Meeting | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 7, 2016 | Permit id: 692590 | |||||
SCORE 100 Wire first floor 400amp service single phase outdoor meter, 200amp service 42 circuit panel 200amp main 1st floor 200amp disconnect and riser cable to 42 circuit main lug panel 2nd floor grounding and rod. All wiring switches, recepts, lights 12 mc cable as per 2008 nec (east district) install fire alarm system as per nfpa72 install data lines Date: July 18, 2016 Contractor: Packer Park Electric Client: Frankford Monthly Meeting | Permit type: Electrical permit | Permit status: Completed | Completion date: October 7, 2016 | Permit id: 694191 | |||||
Asbestos remediation required prior to start of work interior alterations of existing educational facility (1st floor only); alterations to include demolition of interior non-bearing walls, erection of new partitions, doors & windows and structural modifications per signed and sealed plans. Structure is not equipped with an automatic fire suppression system. Separate permits required for plumbing, mechanical, electrical. Upper floors vacant and to be physically sealed per affidavit of restricted use. Date: May 3, 2016 Client: Frankford Monthly Meeting | Permit type: Alteration permit | Permit status: Completed | Completion date: October 7, 2016 | Permit id: 678410 | |||||
To amend bldg permit #6784 for the elimination of supplemental steel framing and use of engineered wood framing instead at 2nd floor; for the erection of accessible ramp in lieu of previously approved platform lift and associated demo and finish work. Date: July 7, 2017 Client: Frankford Monthly Meeting | Permit type: Administrative permit | Permit status: Active | Completion date: July 7, 2017 | Permit id: 706511 | |||||
For ist floor only classes k thru 8. No change to building height or area. No work is proposed on 2nd and 3rd floors, floors will be physically sealed off from rest of building with lockable access door provided (no signs on this application) Date: April 11, 2016 Client: Frankford Monthly Meeting | Permit type: Use permit | Permit status: Completed | Completion date: April 11, 2016 | Permit id: 683101 | |||||
SCORE 100 Wiring 2nd and 3rd floors for class rooms. All wirinng with mc cable to existing 2 amp panel all wiring according to plans. Date: November 28, 2017 Contractor: Packer Park Electric Client: Frankford Monthly Meeting | Permit type: Electrical permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 826037 |