Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 60 Kitchen remodel demo 1. Remove kitchen countertops and cabinets. 2. Remove kitchen flooring down to sub-floor. 3. Remove all debris into dump truck. Plumbing 1. Remove existing gas piping and relocate for new stove position. 2. Remove existing plumbing for sink and relocate for new location of sink. 3. Install new stove, dishwasher and sink. Electric 1. Install new recessed can lighting in ceiling (4) with switch. 2. Install new gfi outlets for counter, outlet for stove, and outlet for dishwasher. 3. Install new range hood. Installations 1. Install new pre-finished hardwood flooring. 2. Install new cabinets. 3. Install new glass tile backsplash. 4. Install recessed shelves into back closet wall. 5. Prep, prime and paint ceiling, walls and trim. Permit type: Addition/alteration | Completion date: March 31, 2014 | Current use: Two-family | Parcel: 26072 | |||||
SCORE 95 Install 12 solar electric panels @3. 06 to roof of existing home, to be interconnected with the homes electrical system {jb-0212819-00} Permit type: Addition/alteration | Completion date: November 25, 2014 | Current use: One-family | Parcel: 26072 |