Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Lattimore, ameran Date: June 14, 2011 Permit type: Electrical | Permit status: Closed | Permit id: 11-03357 | |||||
Kelley driveway Date: July 5, 2011 Permit status: Closed | Permit id: 11-02866 | |||||
SCORE 100 Lattimore, ameran Date: June 14, 2011 Contractor: Jason Kaufman Client: Lattimore, Ameran | Permit type: Com: electrical | Permit status: Closed | Current use: Commercial | Permit id: 11-03357 | Parcel: 12574 | |||||
Kelley driveway Client: Kelley Driveway | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02866 | Parcel: 12574 | |||||
Zoning enforcement Client: Tenant | Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 08-03775s | Parcel: 12574 | |||||
Zoning enforcement Permit status: In compliance | Permit id: 08-03775s | Parcel: 12574 | |||||
May 23, 2011 10:27:15 am kneel. Kelley - new driveway. Location: haywood rd to brownwood to logan.; received from dsc on may 23, 2011 12:26:35 pm twilliams.; may 24, 2011 1:13:37 pm kneel. Ok per msd; driveway / engineering the approval of this driveway permit was based on information that was provided by the contractor, developer, and/or homeowner. The contractor, developer, and/or homeowner is responsible to ensure that the driveway(s) are constructed according to all current city guidelines, specifications, and standards. - the approval of this driveway permit does not imply or guarantee that the driveway(s) can be constructed because of the existing topography and/or other challenges. - driveways that serve single-family units must be built in accordance with one of the following designs. (#1) 6? ? 40 psi concrete on 100% compacted 6? Cabc, or (#2) 2? ? Type ii asphalt on 6? 100% compacted cabc stone. The driveway apron must be concrete if the roadway has concrete curb, curb an Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02866 | Parcel: 12574 | |||||
Zoning enforcement Date: June 5, 2008 Client: Tenant | Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 08-03775s | Parcel: 12574 | |||||
May 23, 2011 10:27:15 am kneel. Kelley - new driveway. Location: haywood rd to brownwood to logan.; received from dsc on may 23, 2011 12:26:35 pm twilliams.; may 24, 2011 1:13:37 pm kneel. Ok per msd; driveway engineering the approval of this driveway permit was based on information that was provided by the contractor, developer, and or homeowner. The contractor, developer, and or homeowner is responsible to ensure that the driveway(s) are constructed according to all current city guidelines, specifications, and standards. - the approval of this driveway permit does not imply or guarantee that the driveway(s) can be constructed because of the existing topography and or other challenges. - driveways that serve single-family units must be built in accordance with one of the following designs. (#1) 6? ? 40 psi concrete on 100% compacted 6? Cabc, or (#2) 2? ? Type ii asphalt on 6? 100% compacted cabc stone. The driveway apron must be concrete if the roadway has concrete curb, curb an Date: July 5, 2011 Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02866 | Parcel: 12574 | |||||
SCORE 98 March 1, 2011 1:25:16 pm jfortner. Water/sewer replacement sf. To schedule inspection call redacted phone number, jlf Date: March 4, 2011 Contractor: Arrow Plumbing Client: Kelley, Ameran | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-01117 | Parcel: 332688 | |||||
Zoning enforcement Date: June 5, 2008 Permit status: In compliance | Permit id: 08-03775s | Parcel: 12574 |