Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Phase 1 of 2 tenant improvement ~10,000sf for existing firm "hewlett packard ". Includes lobby, office and conference room reconfiguration associated mep. Permit status: Permit issued | Permit id: 15000-00658 | |||||
SCORE 74 Bldg 2, first floor: new fume hood with chemical storage cabinets for r&d lab approx 7 sq ft with accessory utilities to hood. Application expired 3 13 15 and tenant does not plan to move forward with this project Permit status: Void | Permit id: 14000-00560 | |||||
SCORE 95 Hewlett packard: building 3 welcome center. Structural connection details for (n) owner provided furniture display walls. No demo no m. E. P. Permit status: Permit issued | Permit id: 17000-00435 | |||||
Building 5: interior remodel at conference (2845 sf) room on the middle floor for existing tenant "hp, inc" Date: September 1, 2017 Value: $700,000 Permit status: Approved | Permit id: 17000-02091 | |||||
SCORE 88 Hewlett packard: installation of etcher tool Permit status: In plan check | Permit id: 15000-00116 | |||||
SCORE 88 14000-00620: deferred submittal for raised floor calcs and for equipment anchorage calcs. Revision to alter electric distribution. Date: December 9, 2014 Contractor: Ray L Hellwig Plumbing And Heating Inc Permit status: Permit issued | Permit id: 14rev-00738 | |||||
SCORE 99 17000-00106: revision add a no access locked door at the top of the stairwells between 1 upper and 1 lower Date: February 28, 2017 Contractor: Rudolph And Sletten Inc Permit status: Permit issued | Permit id: 17rev-00119 | |||||
SCORE 88 Hp1 - lower: install of oxford ald (flexal) chamber Permit status: Permit issued | Permit id: 14000-02315 | |||||
SCORE 68 Installation of two illuminated bench sign assemblies Permit status: In plan check | Permit id: 17000-01001 | |||||
SCORE 88 Bldg 1 lower existing firm "hewlett packard" install ion beam tool and associated mep Permit status: Permit issued | Permit id: 14000-00625 | |||||
SCORE 96 133,0 sq ft tenant improvement of hp sv-pa: hewlett packard headquarters. Remodel office areas and work rooms on (4) floors. No exterior modifications Permit status: Permit issued | Permit id: 14000-00862 | |||||
SCORE 88 14-862: demo process equipment in preparation for new equipment. Date: July 28, 2014 Contractor: Ray L Hellwig Plumbing And Heating Inc Permit status: Permit issued | Permit id: 14rev-00435 | |||||
SCORE 96 Hp sv-pa (2475 sf) restroom upgrades for ada compliance Permit status: Permit issued | Permit id: 14000-01942 | |||||
SCORE 70 14000-00796: deferred submittal for chainlink security enclosures in new storage room for lower level of building 5 (level 5l) Date: May 5, 2014 Contractor: Dryco Construction Inc Permit status: Permit issued | Permit id: 14rev-00267 | |||||
SCORE 96 Building 2l: 47 sq ft t. I. To enlarge lower data center Permit status: Permit issued | Permit id: 14000-00595 | |||||
SCORE 96 14000-00595: deferred submittal for data center raised floor access system Date: April 17, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00226 | |||||
SCORE 96 14-595 - revise electrical power panel distribution. Date: May 2, 2014 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 14rev-00264 | |||||
133,0 sq ft interior non-structural demo for hewlett packard all (4) floors Date: April 14, 2014 Permit status: Permit issued | Permit id: 14000-00863 | |||||
SCORE 79 Replace 60 lb boiler in the basement for existing tenant "hewlett packard". No change to gas demand Permit status: Permit issued | Permit id: 17000-01951 | |||||
SCORE 96 4814 sq ft interior improvements including modification of existing office area into new storage room for lower level of building 5 (level 5l) Permit status: Permit issued | Permit id: 14000-00796 | |||||
SCORE 96 Building 1 lower: 14 sq ft t. I for exascale office workroom modifications Permit status: Permit issued | Permit id: 14000-00596 | |||||
SCORE 88 Interior non-structural demo bldg1l in preparation for tenant improvement. Includes excavation up to 3 ft. For total of ~58cubic yards. Ti under separate permit. Date: March 14, 2014 Contractor: Ray L Hellwig Plumbing And Heating Inc Permit status: Permit issued | Permit id: 14000-00586 | |||||
SCORE 96 Bldg 3: install a (n) demising wall and door assembly in existing room Permit status: Permit issued | Permit id: 14000-00570 | |||||
SCORE 96 Bldg 3: installation of (n) sem equipment assembly that includes a kva ups system with battery backup Permit status: Permit issued | Permit id: 14000-00569 | |||||
SCORE 99 Building 5-upper, hewlett-packard: tenant improvement ~1944sf includes new conference room and office and data room with ups. Permit status: Permit issued | Permit id: 13000-01943 | |||||
SCORE 99 Hewlett packard: 592 sf ti at the lobby. Permit status: Permit issued | Permit id: 13000-02459 | |||||
SCORE 99 13000-01943: removal of lobby scope and update of detail for equipment Date: August 22, 2013 Contractor: Rudolph And Sletten Inc Permit status: Permit issued | Permit id: 13rev-00528 | |||||
SCORE 90 Renovation of (e) server lab: relocate non-structural wire enclosure, relocate (e) card reader and reconfigure cable tray. Permit status: Permit issued | Permit id: 13000-02298 | |||||
SCORE 96 Hewlett-packard: building 3, lower floor. New accoustical walls, rework mechanical, demo existing t-bar ceiling, new electrical outlets lighting, minor plumbing in breakroom(90 sf) Date: March 25, 2013 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 13000-00816 | |||||
SCORE 96 Building 3-lower, hewlett-packard: replace three (3) exterior doors and and increase header height from eight (8) feet to ten (10) feet. Date: April 24, 2013 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 13000-01118 | |||||
SCORE 96 Hewlett-packard: building 3, lower floor. Interior non-structural demo permit (75 sf) Date: March 14, 2013 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 13000-00720 | |||||
SCORE 88 Hewlett packard: install an "optics sputter" tool and six (6) process piping systems. Install electrical cabinets for the new tool. No new electrical panels or service upgrade required Date: September 27, 2012 Contractor: Ray L Hellwig Plumbing And Heating Inc Permit status: Permit issued | Permit id: 12000-02433 | |||||
SCORE 96 Hp building 2: install new wet etcher equipment. Date: March 27, 2012 Contractor: Wolf Electric Permit status: Permit issued | Permit id: 12000-00683 | |||||
SCORE 100 Building 6: revise east facade to stucco finish where the (e) exterior tile is failing. Date: October 9, 2012 Contractor: Dpr Construction Permit status: Permit issued | Permit id: 12000-02529 | |||||
SCORE 100 11000-00126: at two (e) exterior stairways replace non-accessible handrails to meet code. Date: April 13, 2012 Contractor: Dpr Construction Permit status: Permit issued | Permit id: 12rev-00216 | |||||
SCORE 100 11-2762; revised finishes @ accessible shower Date: April 4, 2012 Contractor: Dpr Construction Permit status: Permit issued | Permit id: 12rev-00198 | |||||
11-3239: hewlett packard, building 5 -lower level: modification to storage room to add a separate work room. Date: March 7, 2012 Permit status: Permit issued | Permit id: 12rev-00142 | |||||
SCORE 100 11-2761; revision to include refresh of (e)training room; ramp, new finishes and lighting work. Date: February 24, 2012 Contractor: Dpr Construction Permit status: Permit issued | Permit id: 12rev-00109 | |||||
SCORE 100 11-2763; reduce scope plans to include elimination of computer and lab area. Date: February 10, 2012 Contractor: Dpr Construction Permit status: Permit issued | Permit id: 12rev-00082 | |||||
SCORE 100 11-2762: revision to stair support Date: January 23, 2012 Contractor: Dpr Construction Permit status: Permit issued | Permit id: 12rev-00042 | |||||
11-2762: pantry revision swap w storage Date: January 20, 2012 Permit status: Permit issued | Permit id: 12rev-00031 | |||||
SCORE 96 Hp building 2 second floor 3,0 sf interior non structural demo in preparation for new lab. Must run concurrently with fire closure permit. Date: April 3, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15000-00825 | |||||
SCORE 96 15-1020: revised plans for new fire rating ceiling to mitigate lack of rooms fire rating continuity. Revised power and wall layout. Date: June 2, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15rev-00320 | |||||
SCORE 95 Hp building b3u 48,0 sf interior non-structural demo Date: April 13, 2015 Contractor: Turner Construction Company Permit status: Permit issued | Permit id: 15000-00913 | |||||
SCORE 96 T. I for existing tenant (hewlett packard) building 3 lower remodel existing 20 sf conference room Permit status: Permit issued | Permit id: 15000-01408 | |||||
SCORE 95 Hp 3 upper: 47,161 sf ti for (e) tenant including new non-structural partitions, suspended ceilings, lighting, finishes, electrical, mechanical, plumbing and (n) restrooms at upper level. Permit status: Approved | Permit id: 15000-00993 | |||||
SCORE 96 Lab tenant improvement ~3000sf for existing firm "hp". Includes associated electrical, machanical and plumbing. Permit status: Approved | Permit id: 15000-01020 | |||||
SCORE 95 Hp: 1,456 sf ti for (e) tenant including non structural partitions, suspended ceilings, lighting, finishes, electrical, mechanical on all three levels to separate entire building into two hp tenants Permit status: Approved | Permit id: 15000-01045 | |||||
SCORE 95 15-993: revised interior work. Field clarifications on interior work . See attached. Date: July 20, 2015 Contractor: Turner Construction Company Permit status: Permit issued | Permit id: 15rev-00415 | |||||
T. I. For existing tenant , "hewlett packard", (bldg 2 upper) conference room (393 sf), associated electrical and mechanical Date: June 17, 2015 Value: $130,000 Permit status: Approved | Permit id: 15000-01544 | |||||
SCORE 84 Add relief dampers in the mechanical enclosure on the roof for existing tenant "hewlett packard". Scope of work also includes adding exhaust ducts from labratory spaces Permit status: Permit issued | Permit id: 17000-01953 | |||||
SCORE 96 15000-01020: deferred submittal for equipment anchorage. Date: July 21, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15rev-00418 | |||||
SCORE 96 15000-01408: deferred submittal for structural anchorage Date: July 22, 2015 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 15rev-00422 | |||||
SCORE 68 Building 3: install two (2) dual head amp evse, a step down transformer, and a 225 amp subpanel for hewlett packard Date: February 24, 2017 Contractor: Wolf Solutions Group Inc Permit status: Permit issued | Permit id: 17000-00368 | |||||
SCORE 63 Install (3) dual electric vehicle charging stations at parking lot Permit status: In plan check | Permit id: 17000-02473 | |||||
SCORE 88 Bldg 1 lower existing firm "hewlett packard" tenant improvement includes install of class 10 clean room and tool associated mechanical electrical and process piping for research and development. Project includes excavation to accomodate raised floor for clean room. Permit status: Permit issued | Permit id: 14000-00620 | |||||
SCORE 88 Hp 1 - upper: installation of amat p50 etcher system Permit status: Permit issued | Permit id: 16000-00911 | |||||
SCORE 61 Hewlett packard: bathroom remodel for (e) tenant. Renovate one men and one womens restroom on the 5th floor (925 sf). No changes to lighting. Permit status: Finaled | Permit id: 16000-01649 | |||||
SCORE 99 Ti for existing tenant "hewlett packard enterprise" interior only 960sf new conference room at building 1 upper new non structural partition walls. Demising walls and doors at 1 lower. M Permit status: Finaled | Permit id: 17000-00106 | |||||
Hewlett packard inc: remodel of (e) cleanroom. Adding hepa filters and replace one rooftop unit on the roof in the same location. (605 sf) Date: August 26, 2016 Value: $97,937 Permit status: Approved | Permit id: 16000-02166 | |||||
SCORE 99 Hewlett packard 3 lower: 3 sf remodel for existing tenant. Computer room to receive new glazing, relocate door, adding new glass door. No exterior work Permit status: Finaled | Permit id: 16000-02342 | |||||
SCORE 74 Ti for existing tenant "hewlett packard" bldg 2l 751 sf interior only. Scope of work includes new door opening , non functioning demo kitchen no plumbing. Permit status: Finaled | Permit id: 16000-01332 | |||||
SCORE 96 Ti bldg #4a: interior ti existing tenant "hp"(50 sf) Permit status: Permit issued | Permit id: 17000-02536 | |||||
SCORE 99 Hewlett packard: modify one exterior door, exterior stair, add ada compliant ramp, add one accessible parking space, and modify landscaping (4 sf). Planning approval under 16pln-00110. Permit status: Finaled | Permit id: 16000-01497 | |||||
SCORE 68 Installation of new interior glass curtain wall assembly. Building 2 lower. 383 sf. Permit status: Permit issued | Permit id: 17000-01298 | |||||
SCORE 96 17-2091: structural deferred submittal for screen mount and wood wall attachment. Eliminat fir smoke dampr proposed @ (e) wall. No rating required. Date: October 27, 2017 Contractor: Xl Construction Corporation Permit status: Permit issued | Permit id: 17rev-00698 | |||||
SCORE 88 Tmobile add 3 antenas add 3 rrus and 3 diplexers to the ground Permit status: Permit issued | Permit id: 16000-00660 |