Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 3, 2016 Contractor: Bill Howe Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 98 Res reroof - 44 sf - asphalt shingles to asphalt shingles () if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer owens corning brand and model oakridge trudefinition duration color (if cool roof required) sierra gray. Crrc #0890-0013 built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes note self-certification for interior attic by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Misc electrical for riser repair. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 10 10 16-plan change to add electrical for riser repair. Kp Date: September 12, 2016 Contractor: Suacci Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 2, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: October 25, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: July 24, 2007 Permit status: Pass | Permit id: Pds2007-1023-20 |