Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: December 13, 2016 Client: Wimbush Martin J Wimbush Diane | Permit status: Active | Permit id: 743198 | |||||
SCORE 70 Install 4 inch brick veneer on new concrete footing in front of existing masonry wall as per 2009 irc 703. 7. Maximum thickness 5 inches. An inspection of existing wall to be scheduled with inspector before work starts. Contractor agrees agrees to limit the construction to comply with ez permit standard for stone & masonry veneer walls. Date: December 13, 2016 Contractor: Ryan Baldwin Client: Wimbush Martin J Wimbush Diane | Permit type: Alteration permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 743198 | |||||
SCORE 100 Level ii alterations (no change of occupancy) for renovations to existing first floor vacant commercial space to include new ramp, accessible toilet room and rear fence and renovations to existing second floor dwelling unit to include new stair as per approved plans. Existing building not required to be sprinklered. Separate permits required for mep work Date: June 27, 2017 Contractor: Yong General Construction Client: Jin Bixiong | Permit type: Alteration permit | Permit status: Active | Completion date: July 19, 2017 | Permit id: 752991 | |||||
SCORE 100 Ez exterior wall coverings - for the application of exterior wall coverings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: June 9, 2016 Contractor: Yong General Construction Client: Jin Bixiong | Permit type: Alteration permit | Permit status: Expired | Completion date: June 28, 2017 | Permit id: 698843 |