Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Remove and replace sf sheetrock, remove vinyl in upstairs bath, repair damaged floor, mold remediation per pacific 1aq microbial inspection report dated 11/14/12,(ce12-0729). Date: December 11, 2012 Contractor: North Bay Environmental Inc Permit status: Finaled | Permit id: B12-4411 | |||||
SCORE 63 Remove existing roofing, install 2x4 sleepers with 1/2" cdx roof sheathing. Install new 2x8 fascia, modified rolled roofing. Tuck under flashing. Install new gutters and downspout. Ce11-0520.,unit 1; 2/13/11 - replace 16 feet of soffet framing; remov Date: February 6, 2012 Contractor: Gross Enterprises Permit type: Roof | Permit status: Finaled | Permit id: B12-0409 | |||||
SCORE 86 Remove existing roof from balcony overhangs. Install a modified roofing system with new perimeter metal. Date: September 3, 2013 Contractor: Ducharme Rhonda Permit type: Roof | Permit status: Finaled | Permit id: B13-3429 | |||||
SCORE 84 Repair main sewer line from sidewalk to fence line. Date: May 14, 2013 Contractor: All Out Plumbers Permit type: Fence | Permit status: Finaled | Permit id: B13-1703 | |||||
SCORE 98 Replace fau in garage with new 95% 40k unit. Date: October 23, 2013 Contractor: Moore Heating And Air Conditioning Permit status: Issued | Permit id: B13-4290 | |||||
SCORE 56 Repair decks and stairs near 5,9&10. Replace t-111 as needed. Replace p-trap at bath sink, replace bath exhaust fan, patch drywall in hall closet unit 27. Replace joists-carport adj to 8&9. All exterior work to be replaced in kind. Date: March 19, 2013 Contractor: Appell Allen L Tr Permit status: Finaled | Permit id: B13-0924 | |||||
SCORE 73 Replace existing furnace. Date: January 24, 2012 Contractor: Hanson Kim Permit status: Finaled | Permit id: B12-0269 | |||||
Overlay 1 layer of foam roofing with 1" spf silicone coating 37 square Date: November 25, 2014 Permit type: Roof | Permit status: Issued | Permit id: B14-4781 | |||||
SCORE 92 Tearoff reroof apts #5 & 6. 22 square. Ok per sam lynch, not part of violation. Date: December 10, 2012 Contractor: Capstone Roofing Inc Permit type: Roof | Permit status: Finaled | Permit id: B12-4397 | |||||
SCORE 92 Tearoff reroof apts #5 & 6. 22 square. Ok per sam lynch, not part of violation. Date: December 10, 2012 Contractor: Capstone Roofing Inc Permit type: Roof | Permit status: Finaled | Permit id: B12-4397 |