Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dc water clean rivers project- anacostia river tunnel m street drop shaft site civil work for construction staging area. General land disturbance, grading, clear and grub, sediment erosion control, stromwater management Date: April 28, 2014 Client: Dc Water Carlton Ray | Applicant: Zill; Zill | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400025 | |||||
After hours work at dc waters clean rivers project- div h m street drop shaft site. Site is located at southeast corner of m and water st. Se. Second shift work necessary to meet the contractual milestones set forth in epa consent decree. All work will be conducted within existing lod shown on dcra-approved permit drawings and inside ddot-approved mot measures. Duration of after hours work from 6/30/14 to 7/30/14 Date: June 25, 2014 Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400552 | |||||
Support of excavation for dc water clean rivers div h-m street drop shaft. Structural slurry wall of 36 inch thick 5000psi reinforced concrete, to support excavation of 68 internal diameter shaft, 1 deep from ground surface. Site plans already approved by ddoe under permit bciv1400025. Date: August 26, 2014 Client: Dc Water Carlton Ray | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400065 | |||||
After hours work at dc waters clean rivers project- div h m street drop shaft site. Site is located at southeast corner of m and water st. Se. Second shift work necessary to meet the contractual milestones set forth in epa consent decree. All work will be conducted within existing lod shown on dcra-approved permit drawings and inside ddot-approved mot measures. Duration of after hours work from 6/30/14 to 7/30/14 Date: June 25, 2014 Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400552 | |||||
Support of excavation for dc water clean rivers div h-m street drop shaft. Structural slurry wall of 36 inch thick 5000psi reinforced concrete, to support excavation of 68 internal diameter shaft, 1 deep from ground surface. Site plans already approved by ddoe under permit bciv1400025. Date: August 26, 2014 Client: Dc Water Carlton Ray | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400065 | |||||
SCORE 93 Electrical Date: July 13, 2015 Contractor: Mark Ey Fuhrman Permit status: Permit issued | Permit id: E1507395 | |||||
Address change only. Ref #b1507009 change to establish pepco billing account for electrical service. Date: July 1, 2015 Client: Dc Water | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1509644 | |||||
SCORE 56 Dc water clean rivers project- anacostia river tunnel m street drop shaft site civil work for construction staging area. General land disturbance, grading, clear and grub, sediment erosion control, stromwater management Date: April 28, 2014 Contractor: Zill Zill Client: Dc Water Carlton Ray | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400025 | |||||
After hours work at dc waters clean rivers project- div h m street drop shaft site. Site is located at southeast corner of m and water st. Se. Second shift work necessary to meet the contractual milestones set forth in epa consent decree. All work will be conducted within existing lod shown on dcra-approved permit drawings and inside ddot-approved mot measures. Duration of after hours work from 6/30/14 to 7/30/14 Date: June 25, 2014 Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400552 | |||||
Support of excavation for dc water clean rivers div h-m street drop shaft. Structural slurry wall of 36 inch thick 5000psi reinforced concrete, to support excavation of 68 internal diameter shaft, 1 deep from ground surface. Site plans already approved by ddoe under permit bciv1400025. Date: August 26, 2014 Client: Dc Water Carlton Ray | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400065 | |||||
After hours work at dc waters clean rivers project- div h m street drop shaft site. Site is located at southeast corner of m and water st. Se. Second shift work necessary to meet the contractual milestones set forth in epa consent decree. All work will be conducted within existing lod shown on dcra-approved permit drawings and inside ddot-approved mot measures. Duration of after hours work from 6 30 14 to 7 30 14 Date: June 25, 2014 Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400552 | |||||
Support of excavation for dc water clean rivers div h-m street drop shaft. Structural slurry wall of 36 inch thick 5000psi reinforced concrete, to support excavation of 68 internal diameter shaft, 1 deep from ground surface. Site plans already approved by ddoe under permit bciv1400025. Date: August 26, 2014 Client: Dc Water Carlton Ray | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400065 | |||||
SCORE 59 Dc water clean rivers project- anacostia river tunnel m street drop shaft site civil work for construction staging area. General land disturbance, grading, clear and grub, sediment erosion control, stromwater management Date: April 28, 2014 Contractor: Zill; Zill Client: Dc Water Carlton Ray | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400025 | |||||
SCORE 78 Near surface structures for dc water clean rivers project div h - m street shaft site. Construction of approach channel and odor control venting facility to service shaft. All construction is below-grade sewerage. Includes sheeting & shoring for support of excavation. Erosion control & stormwater management permitted under bciv1400025. Date: August 5, 2015 Contractor: Zachary Zill Client: Carlton Ray Dc Water | Permit type: New building | Permit status: Permit issued | Permit id: B1510808 |