Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Fenwick hall - enlarging bedrooms by remodeling bathrooms. All new finishes. New electronic devices. Relocating plumbing, heating, and sprinklers as neccessary Parcel: 63015 0001 | |||||
SCORE 84 Welch hall, 182 hammond - enlarging bedrooms by remodeling bathrooms; all new finishes; new electronic devices; relocate plumbing, heating, and sprinklers Parcel: 63015 0001 | |||||
SCORE 84 Kostka hall, 149 hammond - enlarging bedrooms by remodeling bathrooms; all new finishes; new electronic devices; relocate plumbing, heating, and sprinklers Parcel: 63015 0001 | |||||
SCORE 84 Xavier hall, 44 tudor rd - englarge (3) existing windows and install larger windows Parcel: 63015 0001 | |||||
SCORE 88 Masonry repairs to exteriors of clx and fitzpatrick halls Parcel: 63015 0001 | |||||
SCORE 56 "kostka dorm - upper campus. Replace 24 shower stalls mixing valves and heads. Parcel: 63015 0001 | |||||
SCORE 85 Tudor road: cutting and pointing of mortar joints, washing brick, and caulking windows. Parcel: 63015 0001 | |||||
SCORE 80 Xavier hall @ 44 tudor st: renovate (3) existing dorm suites, bathroom demo, new ceilings, carpet and paint. Reuse existing hvac and lighting. Parcel: 63015 0001 | |||||
SCORE 80 Fitzpatrick hall @ 137 hammond st: renovate (6) existing dorm suites, bathroom demo, new ceilings, carpet and paint. Reuse existing hvac and lighting. Parcel: 63015 0001 | |||||
SCORE 80 Cheverus hall @ 127 hammond st: renovate (6) existing dorm suites, bathroom demo, new ceilings, carpet and paint. Reuse existing hvac and lighting. Parcel: 63015 0001 | |||||
SCORE 80 Gonzaga hall @ 149 hammond st: renovate (5) existing dorm suites, bathroom demo, new ceilings, carpet and paint. Reuse existing hvac and lighting. Parcel: 63015 0001 | |||||
SCORE 80 Gonzaga hall @ 149 hammond st: interior demo only of (5) dorm rooms Date: May 23, 2013 Contractor: Daniel Stout Parcel: 63015 0001 | |||||
SCORE 80 Cheverus hall @ 127 hammond st: interior demo of (6) dorm rooms only. Date: May 23, 2013 Contractor: Daniel Stout Parcel: 63015 0001 | |||||
SCORE 97 Cheverus hall-interior renovations to student lounge area. New partitons, millwork, lighting, mechanical, finishes, and handicap lift. Parcel: 63015 0001 | |||||
SCORE 87 Boston college - remove and replace boilers emergency generator and concrete repair Parcel: 63015 0001 |