Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 80 Store front and flat sign Date: September 16, 2014 Contractor: Namba Services Inc Permit type: Sign | Permit status: Pass | Completion date: October 16, 2014 | Permit id: Bld2014-06754 | |||||
SCORE 77 1-gas line Date: October 8, 2014 Contractor: T And S Plumbing Llc Permit type: Plumbing | Permit status: On-line ready | Completion date: October 8, 2014 | Current use: Commercial | Permit id: Bld2014-07330 | |||||
Obtaining permit for rmp so they can move the service drop that is feeding a reagan billboard and resolve a clearance issue. Date: November 18, 2014 Permit type: Electrical | Permit status: Pass | Completion date: December 19, 2014 | Current use: Residential | Permit id: Bld2014-08496 | |||||
SCORE 86 Flat storefront sign Date: January 9, 2015 Contractor: Allied Awning And Rental Incmetro Pcs Permit type: Sign | Permit status: In progress | Completion date: January 9, 2015 | Permit id: Bld2015-00162 | |||||
SCORE 100 Flat wall sign Date: March 11, 2015 Contractor: Image Sign And Lighting Llc Permit type: Sign | Permit status: Pass | Completion date: April 22, 2015 | Permit id: Bld2015-01600 | |||||
Sinks 3, mop/service sinks 1, water heaters 1 Date: June 3, 2015 Permit type: Plumbing | Permit status: Pass | Completion date: June 4, 2015 | Current use: Commercial | Permit id: Bld2015-03907 | |||||
SCORE 64 Electrical only. Add additional receptacles/circuit for freezer and provide circuit to water heater. Date: June 17, 2015 Contractor: Sonjahe Asian Market Permit type: Electrical | Permit status: Pass | Completion date: June 24, 2015 | Current use: Commercial | Permit id: Bld2015-04360 | |||||
SCORE 64 Installing two floor sinks , one floor drain ,grease trap , mop sink with three comp , and hand sink Date: October 31, 2013 Contractor: Marios Plumbing And Heatingsweatheart House Permit type: Plumbing | Permit status: Accepted | Completion date: October 31, 2013 | Current use: Commercial | Permit id: Bld2013-08084 | |||||
SCORE 64 Commercial rmeodel - 4 receptacles, 2 exit signs and 2 fixture relocation Date: September 9, 2011 Contractor: Hi Electricalmid Town Permit type: Electrical | Permit status: Pass | Completion date: October 7, 2011 | Current use: Commercial | Permit id: Bld2011-05744 | |||||
1 flat sign: 18 sqft cc zone, storefront 16 length, sign size 18 sqft, flat sign where 24 sqft would be allowed. A. S. Date: December 22, 2010 Permit type: Sign | Permit status: Pass | Completion date: December 22, 2010 | Permit id: Bld2010-08796 | |||||
SCORE 59 Remove existing epdm over built-up roofing. Repair or replace any damaged sheathing. Install iso insul board and gaf tpo membrane 60mil. Date: March 11, 2016 Permit type: Roofing | Permit status: Closed | Completion date: June 1, 2016 | Current use: Commercial | Permit id: Bld2016-02243 | |||||
S. F. Flat walk cabinet sign Date: April 8, 2016 Permit type: Sign | Permit status: Closed | Completion date: May 13, 2016 | Permit id: Bld2016-03294 | |||||
SCORE 69 1 - message board - 67. 5 sq ft 1 - flat sign remove banners. Electgronic message board approved per 21a. 46. Date: May 30, 2012 Contractor: Jared Lynn Skinnermahider Ethiopian Resaurant Permit type: Sign | Permit status: Closed | Completion date: October 15, 2015 | Permit id: Bld2012-03989 | |||||
SCORE 66 Restaurant t. I., no mech work, no elec work, plmbg permit reqd (relocated toilet) t. B. This permit does not include any signage a. H. Date: September 16, 2014 Contractor: Namba Services Inctoshs Ramen Permit type: Permit | Permit status: Completed | Completion date: September 16, 2014 | Current use: Commercial | Permit id: Bld2014-06750 | |||||
Build 3 partition walls out of 2"x4" (24" on center) brace walls w/45 deg angle bracing, no elec/plmbg/mech work r. M. Cc zone, partitions within tenant space for retail service(s) business a. S. Date: April 10, 2013 Permit type: Permit | Permit status: Pass | Completion date: April 26, 2013 | Current use: Commercial | Permit id: Bld2013-02166 | |||||
SCORE 69 1 - message board - 67. 5 sq ft 1 - flat sign remove banners. Electgronic message board approved per 21a. 46. Date: May 30, 2012 Contractor: Jared Lynn Skinnermahider Ethiopian Resaurant Permit type: Sign | Permit status: Completed | Completion date: May 30, 2012 | Permit id: Bld2012-03989 | |||||
SCORE 66 Convert retail clothing store to sandwich shop, plmbg & elec permits reqd t. B. Cc zone, ken brown zoning reviewer passed in accela, a. S. For k. B. Date: June 1, 2011 Contractor: Jkm Construction Incparadiso Sandwich Shop Permit type: Permit | Permit status: Pass | Completion date: October 18, 2011 | Current use: Commercial | Permit id: Bld2011-03138 | |||||
SCORE 66 Plumbing restaurant unit #5 Date: August 31, 2011 Contractor: Marios Plumbing And Heatingcaffe Paradiso Permit type: Plumbing | Permit status: Pass | Completion date: October 11, 2011 | Current use: Commercial | Permit id: Bld2011-05538 | |||||
SCORE 66 Install addl meter to existing meter stack and connect to new panel for future eqpmnt Date: August 31, 2011 Contractor: Robbins Central Electricoverseas Bakery Permit type: Electrical | Permit status: Pass | Completion date: September 2, 2011 | Current use: Commercial | Permit id: Bld2011-05527 | |||||
SCORE 66 Minimum electrical to add outlets and get 2 up to code. Unit #1 Date: April 6, 2010 Contractor: Big City Electricmidtown Wholesale Permit type: Electrical | Permit status: Pass | Completion date: April 15, 2010 | Current use: Commercial | Permit id: Bld2010-01935 |