Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install tpo 45 mil single ply membrane roof after fanfold insulation it has installed over existing roof, all seams shall be heat welded together, roof membrane and insulation shall be mechanically attached to the roof, all roof penetrations shall have a pipe boot, secure perimeter using termination bar and screws. Date: June 18, 2014 Contractor: Premier Roofing Inc Permit type: Roofing | Permit status: Accepted - standard | Completion date: June 18, 2014 | Current use: Residential | Permit id: Bld2014-04246 | |||||
SCORE 64 Install tpo 45 mil single ply membrane roof after fanfold insulation it has installed over existing roof, all seams shall be heat welded together, roof membrane and insulation shall be mechanically attached to the roof, all roof penetrations shall have a pipe boot, secure perimeter using termination bar and screws. Date: June 18, 2014 Contractor: Premier Roofing Inc.Jose Lopez Permit type: Roofing | Permit status: Inspections | Completion date: June 18, 2014 | Current use: Residential | Permit id: Bld2014-04246 | |||||
SCORE 64 Install tpo 45 mil single ply membrane roof after fanfold insulation it has installed over existing roof, all seams shall be heat welded together, roof membrane and insulation shall be mechanically attached to the roof, all roof penetrations shall have a pipe boot, secure perimeter using termination bar and screws. Date: June 18, 2014 Contractor: Premier Roofing Inc.Jose Lopez Permit type: Roofing | Permit status: Inspections | Completion date: June 18, 2014 | Current use: Residential | Permit id: Bld2014-04246 |