Content |
---|
SCORE 95 Interior, non-structural remodel. Replacing the front door and associated aged framing. Installation of a new 3 4 bath on the upper level. Associated meps covered within the scope of this permit, including water piping, electrical in the bathroom, and installation of a new boiler on the lower level. Client: Brian Schroy | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Single family detached dwelling, remodel | Permit id: Pmt2017-03899 |
Bring new ug electric secondary out of xfmr, bore 4inch pe conduit to new ped #12570566 ![]() Client: Llc Mapleton | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-03620 |
SCORE 100 New meter pedstal at mapleton mobile home park. Client: Llc Mapleton | Permit type: Electrical | Permit status: Cmp | Completion date: September 7, 2017 | Current use: Manufactured/mobile home, existing | Permit id: Pmt2017-03644 |
SCORE 100 Total tear-off & reroof of sfd, 14 squares of asphalt shingles and epdm over densdeck on a roof with pitches represented as 6 12 and 1 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Zante Van | Permit type: Roofing | Permit status: Cmp | Completion date: September 13, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-03631 |
SCORE 95 Fa - installation of an aes 7707p radio to monitor a new notifier nfw- facp Client: Properties Rock | Permit type: Fire | Permit status: Cmp | Completion date: October 17, 2017 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2017-03600 |
Permit to remedy conditions of notice and order of cpl2017-00064. Scope of work for this permit includes the conversion of a second kitchen in the principle dwelling into a wet bar area, including replacement of kitchen sink with smaller wet bar sink and removal of gas line to the new inchwet barinch area. Compliance issues noted for the detached accessory structure to be resolved under separate permit after oau application has been reviewed. ![]() ![]() Client: Kimberly Murphy | Permit type: Mechanical, plumbing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-02959 |
SCORE 100 Total tear-off & reroof of sfd, 21 squares of asphalt shingles on a pitch represented as 5 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Benjamin Baruch | Permit type: Roofing | Permit status: Cmp | Completion date: August 17, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-03761 |
SCORE 100 Total tear-off & reroof of sfd, 16 squares of asphalt shingles on a pitch represented as 8 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Felicia Furman | Permit type: Roofing | Permit status: Cmp | Completion date: September 23, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02858 |
Construction of a accessory building with half bath in the rear portion of the lot. First floor of 785 sf, 2nd floor 638 sf with 74 sf balcony. Hydronically heated w mini-split cooling system. ![]() ![]() Client: Kimberly Murphy | Permit type: Building, electrical, mechanical, plumbing, water, wastewater, siding, roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-01499 |
SCORE 95 Replacement of two existing evaporative coolers with high-efficiency units. Client: Properties Rock | Permit type: Mechanical | Permit status: Cmp | Completion date: June 13, 2016 | Current use: Commercial/retail, existing | Permit id: Pmt2016-01810 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 100 | John Mclaughlin | 6,734 Projects | $132,014 Avg. Project Cost | 10 Years in Business | ![]() |
SCORE 100 | Renewal By Andersen | 2,766 Projects | $7,573 Avg. Project Cost | 12 Years in Business | ![]() |
SCORE 99 | Richard Taylor | 238 Projects | $51,490 Avg. Project Cost | 18 Years in Business | ![]() |
SCORE 99 | Brian Field | 161 Projects | $73,354 Avg. Project Cost | 16 Years in Business | ![]() |
SCORE 99 | John Ryan | 1,271 Projects | $37,669 Avg. Project Cost | 21 Years in Business | ![]() |