Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit Date: December 15, 2016 Client: Prestige Design On 7th Ll | Permit status: Active | Permit id: 736877 | |||||
Zoning permit Date: October 3, 2016 Client: Prestige Design On 7th Ll | Permit status: Completed | Permit id: 717137 | |||||
Zoning use permit Date: October 28, 2016 Client: Prestige Design On 7th Ll | Permit status: Completed | Permit id: 732850 | |||||
Mechanical permit Date: December 16, 2016 Client: Prestige Design On 7th Ll | Permit status: Active | Permit id: 744024 | |||||
SCORE 100 New construction of a four (4) story building with a vacant space on the first floor side (use registration and co required prior to occupancy) and six (6) dwelling units as per approved plans. Building to be fully sprinklered. See a p 727268 for foundation work separate permits required for mep & fire suppression work Date: December 15, 2016 Contractor: Ofir Komerian Prestige Design Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: New construction permit | Permit status: Completed | Completion date: June 9, 2017 | Permit id: 736877 | |||||
SCORE 100 For the creation of an alley shared with 1442 n 7th street and 1443 n franklin street. Size and location as shown in application. Date: December 15, 2016 Contractor: Ofir Komerian Prestige Design Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Zoning permit | Permit status: Completed | Completion date: December 15, 2016 | Permit id: 743605 | |||||
SCORE 100 Install (4) heat pumps with ductwork. (multi-family) Date: December 16, 2016 Contractor: Fresh Air Services Inc Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 9, 2017 | Permit id: 744024 | |||||
SCORE 100 For the erection of a four (4) story attached structure with cellar and rear deck as per plans. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: November 15, 2016 Contractor: Ofir Komerian Prestige Design Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: New construction permit | Permit status: Completed | Completion date: July 12, 2017 | Permit id: 727277 | |||||
SCORE 100 For the erection of an attached structure ( nte 38 high) for a vacant commercial space at first floor and multi-family household living ( six(6) dwelling units ) from second through forth floors Date: October 28, 2016 Contractor: Ofir Komerian Prestige Design Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 732850 | |||||
SCORE 100 For the erection of an attached structure. Size and location as shown in application. For use as a vacant space (use registration and co required prior to occupancy) in the first floor side and multi-family household living [six (6) dwelling units] on the first floor side through fourth floors. No signs on this permit. Date: December 15, 2016 Contractor: Ofir Komerian Prestige Design Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 15, 2016 | Permit id: 743613 | |||||
Erection of an attached structure with three (3) interior off street parking spaces for use as multi family household living ((8) eight units)(size and location as shown on plans) (no sign on this permit) Date: October 31, 2017 Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 31, 2017 | Permit id: 749955 | |||||
SCORE 100 600amp service,wire commerical and 6 unit bldg per 2008 nec (mixe use)(east district)install fire alarm per nfpa 72 Date: June 2, 2017 Contractor: Willie Welcome Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Electrical permit | Permit status: Completed | Completion date: June 9, 2017 | Permit id: 756024 | |||||
SCORE 100 New construction: interior & exterior plumbing;(4) story building; vacant space on the first floor; six (6) dwelling units - the installation will comply with the philadelphia plumbing code 2004 Date: March 20, 2017 Contractor: Richards Barrymore Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 12, 2017 | Permit id: 759180 | |||||
SCORE 100 For the installation of a 2-inch fire service line and backlow prevention assembly for an automatic fire supression sprinkler system in accordance with nfpa 13 Date: March 21, 2017 Contractor: Elite Fire Protection Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Suppression permit | Permit status: Completed | Completion date: June 12, 2017 | Permit id: 761200 | |||||
SCORE 100 Install (6) heat pump systems with ductwork. (mixed-use) Date: March 6, 2017 Contractor: Fresh Air Services Inc Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 9, 2017 | Permit id: 764175 | |||||
SCORE 100 Install lateral,curb trap,fai 1 1 2 water service pa201708221 (mixed use) Date: March 24, 2017 Contractor: Richards Barrymore Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 12, 2017 | Permit id: 769418 | |||||
Level ii alterations with partial change of occupancy to increase total number of dwelling units to eight (six previously) and to add three (3) accessory parking spaces in the basement (accessed via mechanical car lift) as per approved plans. See permit 736877 for new construction. Building fully sprinklered per nfpa 13. Separate permits required for any new mep or fire suppression work Date: November 16, 2017 Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Alteration permit | Permit status: Completed | Completion date: November 17, 2017 | Permit id: 826195 | |||||
SCORE 100 For the lot adjustment to create two(2) lots ( lot# 1 and lot# 2) from one(1) opa accounts 1438- n 07th st). Size and location as shown in the application. Date: October 3, 2016 Contractor: Ofir Komerian Prestige Design Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: Zoning permit | Permit status: Completed | Completion date: October 3, 2016 | Permit id: 717137 | |||||
SCORE 100 For the erection of a foundation of a structure for use as a vacant commercial space with a multi-family dwelling (6 units). All work to be done per approved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for above ground structure, mechanical, electrical, plumbing and fire suppression work. Date: November 8, 2016 Contractor: Ofir Komerian Prestige Design Client: Prestige Design On 7th Ll | Client Company: Juron Surveying & Mapping | Permit type: New construction permit | Permit status: Completed | Completion date: June 9, 2017 | Permit id: 727268 |