Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Panel upgrade of msp from 60amps to 100amps for existing sfd. Date: September 18, 2014 Permit type: Electrical : 80 - ac | Permit status: Permit finaled | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Panel upgrade of msp from 60amps to 100amps for existing sfd. Date: September 18, 2014 Contractor: Raceway Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2017 Contractor: Solarcity Corporation Permit type: Addn | Permit status: Completed | Completion date: August 25, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: September 18, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Panel upgrade of msp from 60amps to 100amps for existing sfd. Date: September 18, 2014 Contractor: Raceway Electric Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2014-Resalt- | Parcel: 400-141-03-00 | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2017 Contractor: Solarcity Corporation Permit type: Online | Permit status: Completed | Permit id: Pds2017-Resalt- |