Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 30, 2015 Contractor: Aaron Eriksson Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: May 8, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 30, 2015 Contractor: Solar Symphony Construction Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2015 | Permit id: Pds2015-Resalt- | |||||
Interior remodel to include 35lf reconfiguration of bathroom on second floor, 10sf window replacement on first floor in guest bedroom. Add 1 sqft attached porch. 5/27/2016 plan change. 1 sqft porch. See c of a... Ss Date: January 27, 2016 Value: $3,890 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 65 Interior remodel to include 35lf reconfiguration of bathroom on second floor, 10sf window replacement on first floor in guest bedroom. Add 1 sqft attached porch. 5 27 2016 plan change. 1 sqft porch. See c of a... Ss Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 26, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: October 18, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: May 6, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |