Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Use permit ![]() Client: The African Methodist Episcopal Union Church | Permit status: Completed | Permit id: 347880 | |||||
Administrative permit ![]() Client: The African Methodist Episcopal Union Church | Permit status: Completed | Permit id: 400022 | |||||
Alteration permit ![]() Client: The African Methodist Episcopal Union Church | Permit status: Completed | Permit id: 408874 | |||||
Application for: for a summer camp/after school program for children 5 to 12 years old, not run by the church, on a portion of the second floor, in an existing structure with a previously approved house of worship in an existing two story structure.(no signs on this application) ![]() Client: The African Methodist Episcopal Union Church | Applicant: Sharon Polk Cooper | Permit type: Appeal | Permit status: Held/info | Completion date: February 10, 2012 | Permit id: 16152 | |||||
Permit for the expansion of daycare center to include toddlers, after school program and summer camp (daycare not own and operated by the church) from portion of 2nd floor to basement and 1st floor in the same building with an existing church (religious assembly) and all other uses as previously approved in an existing structure. ![]() Client: The African Methodist Episcopal Union Church | Applicant: Sharon Polk | Permit type: Appeal | Permit status: Held/info | Permit id: 27196 | |||||
Use permit ![]() Client: The African Methodist Episcopal Union Church | Permit status: Completed | Permit id: 347880 | |||||
Alteration permit ![]() Client: The African Methodist Episcopal Union Church | Permit status: Completed | Permit id: 408874 | |||||
Administrative permit ![]() Client: The African Methodist Episcopal Union Church | Permit status: Completed | Permit id: 400022 | |||||
Application for: for a summer camp after school program for children 5 to 12 years old, not run by the church, on a portion of the second floor, in an existing structure with a previously approved house of worship in an existing two story structure.(no signs on this application) ![]() Client: The African Methodist Episcopal Union Church | Applicant: Sharon Polk Cooper | Permit type: Appeal | Permit status: Held/info | Completion date: February 10, 2012 | Permit id: 16152 | |||||
Permit for the expansion of daycare center to include toddlers, after school program and summer camp (daycare not own and operated by the church) from portion of 2nd floor to basement and 1st floor in the same building with an existing church (religious assembly) and all other uses as previously approved in an existing structure. ![]() Client: The African Methodist Episcopal Union Church | Applicant: Sharon Polk | Permit type: Appeal | Permit status: Held/info | Permit id: 27196 | |||||
SCORE 84 Patch leak in roof around ceiling fans. Install new facade board in the rear of the building, plaster and paint interior walls. Call inspector for initial inspection prior to the start of work. ![]() ![]() Client: The African Methodist Episcopal Union Church | Permit type: Alteration permit | Permit status: Completed | Completion date: August 3, 2013 | Permit id: 408874 | |||||
Certificate of occupancy for a partial change of occupancy to an after-school program summer camp (day care) in the first floor of an existing structure; no alterations this permit. ![]() Client: The African Methodist Episcopal Union Church | Permit type: Administrative permit | Permit status: Completed | Completion date: September 13, 2012 | Permit id: 400022 | |||||
Adding the use of a summer camp for children in the same space as church. ![]() Client: The African Methodist Episcopal Union Church | Permit type: Use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 347880 |