Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 7-17-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install a 7. 08kw solar array Date: June 5, 2017 Contractor: Switch Electric Llc Permit type: Electrical | Permit status: Permit closed | Completion date: August 2, 2017 | Expiration date: June 5, 2018 | Current use: Single family / duplex | Permit id: 6600707 | |||||
SCORE 99 Knob tube house rewire with panel change and meter base upgrade Date: April 19, 2017 Contractor: Switch Electric Llc Permit type: Electrical | Permit status: Permit closed | Completion date: June 21, 2017 | Expiration date: April 19, 2018 | Current use: Single family / duplex | Permit id: 6592463 |