Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 11, 2016 Contractor: N B Baker Electric Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 94 3200sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp manufacturer owens corning brand and model tru definitions color (if cool roof required) shasta white built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 2, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: August 19, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: October 30, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |