Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Verizon fios to overlash to existing copper cable 829 of fiber optic cable in se bounded by 11ath st, e. Capitol st, 13th st, and independence ave, as shown on job 8a01818 Date: October 18, 2016 Contractor: Verizon Fi0s Permit type: Over head work; string telecom wire/fiber | Permit status: Assigned | Expiration date: November 30, 2017 | |||||
SCORE 96 Over head work; string telecom wire fiber Date: November 30, 2016 Contractor: Verizon Fi0s Permit status: 8 | Expiration date: May 29, 2017 | Permit id: Pa185326 | |||||
SCORE 96 Verizon fios to overlash to existing copper cable 829 of fiber optic cable in se bounded by 11ath st, e. Capitol st, 13th st, and independence ave, as shown on job 8a01818 Date: May 23, 2017 Contractor: Verizon Fi0s Permit type: Over head work; string telecom wire/fiber | Permit status: Issued | Expiration date: November 25, 2017 | Permit id: Pa185326-R1 | |||||
SCORE 96 Verizon fios to overlash to existing copper cable 829 of fiber optic cable in se bounded by 11ath st, e. Capitol st, 13th st, and independence ave, as shown on job 8a01818 Date: May 26, 2017 Contractor: Verizon Fi0s Permit status: Issued | Expiration date: November 25, 2017 | Permit id: Pa185326-R1 | |||||
SCORE 100 Moving truck Date: August 21, 2017 Contractor: Bayshore Moving And Storage Permit status: Permit expired | Expiration date: August 23, 2017 | Permit id: Pa10459513 | |||||
SCORE 86 Moving truck Date: August 1, 2017 Contractor: Libby Clarke Permit status: Permit expired | Expiration date: August 23, 2017 | Permit id: Pa10456076 |